Setting Up The Chiller Unit - Christie Mirage SST Installation And Setup Manual

Hide thumbs Also See for Mirage SST:
Table of Contents

Advertisement

Setting up the chiller unit

For detailed information on setting up the chiller, refer to the documentation provided b y the
manufacturer of the chiller unit.
1. Position the chiller on level ground.
2. Confirm the chiller can operate and maintain proper specifications as stated in the Mirage SST
Projector Head Specifications Guide (P/N: 020-102994-XX) as it is plumbed to the laser
illumination source.
3. Connect the chiller hoses to the laser illumination source.
For information on connecting the hoses, refer to the chiller's and laser illumination source's
product documentation.
4. Ensure a qualified electrician connects the AC power to the chiller.
For electrical rating information, refer to the license label on the chiller. Additional information
is available in the chiller's product documentation.
Mirage SST Installation and Setup Guide
020-102956-01 Rev. 1 (06-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
Installation and setup
35

Advertisement

Table of Contents
loading

Table of Contents