PRONAR T286 Operator's Manual page 134

Agricultural trailer
Table of Contents

Advertisement

Pronar T286
Install the pins and secure them with new securing cotter pins.
After the first loading of cable, re-check the condition of cable ends, correct if
necessary.
Installation of steel cable
IMPORTANT!
Clamp jaws must be placed at the load bearing cable side - see Figure (5.8).
Secure cable ends by means of heat shrink tubing (5).
Install thimble (3) on cable (1).
FIGURE 5.8
Installation of steel cable clamps
(1) steel cable, (2) clamp jaw, (3) thimble, (4) nut, (5) heat shrink tubing
Install clamp jaws (2) and tighten nuts (4) using proper tightening torque.
The distance between the clamps should be 40 mm.
Clamp jaws must be placed at the load bearing cable side - see Figure (5.8).
The first clamp should be placed directly on the thimble.
5.18
SECTION 5

Advertisement

Table of Contents
loading

Table of Contents