System Installation; Introduction; Before Installation; Install The Extreme Edge Server In The Cabinet - SMART Embedded Computing MC1600 Installation And Use Manual

Extreme edge server
Table of Contents

Advertisement

System Installation

4.1

Introduction

This chapter provides instructions for installing and removing the Extreme Edge Server in
a rack or cabinet. It also provides information and procedures for grounding, powering up
and down, and disconnecting the server from the power feed.
4.2

Before Installation

Refer to
Figure 1-1 on page 49
Before you start the installation, make sure that you have all of the necessary equipment
and tools available.
Usage
General
Server / Rack / Cabinet Four bolts or screws 6mm / 0.24" diameter
Grounding
Power
System Access
Provide the following cables:
Earth grounding cable with an M4 ring lug in case of rack installation
Twisted pair Ethernet cable for connecting the BMC ETH
Twisted pair Ethernet cable for the front panel ETH1 and ETH2 RJ-45 ports
SFP+ or SFP modules or direct connect copper cables for the five SFP+ ports
The connectivity of the RJ-45 ports to CPU1 and/or CPU2 is covered in
49
and
Section 1.7.2.2, PCIe-Based Gigabit Ethernet on page
4.3

Install the Extreme Edge Server in the Cabinet

For installation recommendations regarding outside installations, go to
on page
85.
MC1600 Extreme Edge Server Installation and Use (6806870A02B)
for location of LEDs, connectors and earth ground point.
Equipment and Tools
Torque wrench
ESD wrist strap
2
Ground cable 1.25 mm
for DC system
DC power cable
USB Type-A to USB Type-A cable
PC or laptop
Chapter 4
Figure 1-1 on page
57.
Mounting Options
91

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MC1600 and is the answer not in the manual?

Table of Contents