Removing The Operator Information Panel Assembly; Installing The Operator Information Panel Assembly - IBM Storwize V7000 Unified Problem Determination Manual

Table of Contents

Advertisement

Removing the operator information panel assembly

The following procedure is for a Tier 1 customer replaceable unit (CRU).
Replacement of Tier 1 CRUs is your responsibility. If IBM installs a Tier 1 CRU at
your request, you will be charged for the installation. Service agreements can be
purchased so that you can ask IBM to replace these units.
About this task
To remove the operator information panel assembly, complete the following steps.
Procedure
1. Read the Safety information and "Installation guidelines" on page 60.
2. Follow the procedure in "Removing a file module and disconnecting power" on
3. Remove the cover (see "Removing the cover" on page 89).
4. Disconnect the cable from the back of the operator information panel assembly.
5. Reach inside the file module and press the release tab; then, while you hold the
6. From the front of the file module, carefully pull the operator information panel
7. If you are instructed to return the operator information panel assembly, follow

Installing the operator information panel assembly

The following procedure is for a Tier 1 customer replaceable unit (CRU).
Replacement of Tier 1 CRUs is your responsibility. If IBM installs a Tier 1 CRU at
your request, you will be charged for the installation. Service agreements can be
purchased so that you can ask IBM to replace these units.
128
Storwize V7000 Unified: Problem Determination Guide 2073-720
Operator information
panel
page 58 to suspend the file module from the cluster and shut it down, and then
disconnect all power cords and external cables.
release tab down, push the assembly toward the front of the file module.
assembly out of the file module.
all packaging instructions, and use any packaging materials for shipping that
are supplied to you.

Advertisement

Table of Contents
loading

Table of Contents