Checking The Valves And The Valve/Actuator Combination - Festo MPA-L Series Description

Valve terminal
Table of Contents

Advertisement

4. Commissioning
4.2

Checking the valves and the valve/actuator combination

4−6
The valve terminal MPA−L should be commissioned as follows:
Commissioning variants
Preliminary test of the pneuma
tic tubing connection
Complete commissioning of the
overall system
Tab. 4/2: Commissioning variants
Commissioning the pneumatic components by means of the
manual override is described below.
Commissioning of the CPX terminal is described in the
appropriate description for the CPX bus node (see CPX
system description, table Descriptions of the CPX terminal").
Activity
Test the valve−actuator combina
tion by means of the manual
override
Installing and connecting the
overall system.
Program control via PLC/indu
strial PC.
Festo P.BE−MPAL−EN en 1008NH