Moving Your Sendpro C, Sendpro+ Meter - Pitney Bowes SendPro C Operator's Manual

Hide thumbs Also See for SendPro C:
Table of Contents

Advertisement

Mail Machine Maintenance
It experiences an error
l
To receive or stop receiving these emails:
1. Sign in to your account on pitneybowes.com. If you do not have a Pitney Bowes Your Account
login, see Signing up for a pitneybowes.com account.
2. Find the meter in the Your Products section. If it is not listed, select (+) View more or (+) Add
them now.
3. Select Expand on the meter for which you wish to manage notifications.
4. Select Manage notifications.
5. Check or uncheck the boxes to select the notifications you wish to receive:
To be notified when your meter is low on ink, select Low Ink Level.
l
To be notified if the funds on the meter drop below the set amount, select Meter Funds Low.
l
To be notified about meter errors, select Meter Error.
l
6. Select Done.

Moving your SendPro C, SendPro+ meter

Follow these steps and precautions to move your SendPro® C meter safely. These apply whether you
are moving your meter across the room or to a new facility.
1. If you have a scale, remove it from the top of the meter.
2. Remove the moistener assembly. Once you have removed and cleaned the assembly, place it in a
zip-top bag for transport to prevent any remaining fluid from leaking.
3. Remove the ink cartridge. Once you get the ink cartridge out, place it in a zip-top bag.
4. Close the top cover.
5. Remove any USB cables and optional peripherals, such as a printer or scanner, and pack them
with the meter.
6. Unplug the power cable and pack it with the meter.
7. Once in the new location, re-install any USB cables and peripherals.
8. Plug the power cord into the meter and power outlet.
9. Re-install the ink cartridge.
10. Re-install the moistener assembly.
Pitney Bowes
Operator Guide
August 2019
160

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sendpro+

Table of Contents