Install The Vedge 100M Router - Cisco vEdge Series Hardware Installation Manual

Table of Contents

Advertisement

vEdge 100m Router
• Maintain ambient airflow for the router to operate normally. The ambient intake air temperature should
• The airflow to the router is from the top surface near the Viptela logo. To ensure that the airflow to the
• Avoid temperature extremes. Ensure that the router is operating at an ambient temperature not more that
• High humidity conditions can cause moisture to penetrate into the chassis. The device supports 10% to

Install the vEdge 100m Router

Once you have prepared your site for router installation, unpack the vEdge 100m router and install the SIM
card and the antennas before you mount the router on the wall.
Unpack the vEdge 100m Router
A vEdge 100m router is shipped in a cardboard carton and is secured firmly in place with foam packing
material. The carton contains a packing list and Quick Start instructions. It is recommended that you not
unpack the router until you are ready to install it.
To unpack the router:
1. Open the top flaps of the carton.
2. Gradually remove the packing foam holding the router and the accessories in place. See Figure 1.
3. Take out the router and each accessory.
4. Verify the router components against the packing list included in the box (see packing list below).
Figure 1: Unpacking the vEdge 100m Router
be in the range 0°C to 40°C (32°F to 104°F). If the airflow is blocked or if the intake air is too warm,
the router can become overheated.
router is not blocked, keep an air gap of 2-3 inches (5-8 cm) above the router and do not place anything
directly on top of the router.
40°C (104°F) at sea level. For higher altitudes, a derating of 1.5°C per 1,000 feet applies.
85% humidity levels, noncondensing.
Install the vEdge 100m Router
Hardware Installation Guide for vEdge Routers
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents