Front Panel Components - Cisco vEdge Series Hardware Installation Manual

Table of Contents

Advertisement

vEdge 1000 Router
Item
MTBF
Regulatory Compliance
Safety
EMC
Environmental
Rack-Mount Tray Specifications
Table 2 lists the specifications for the rack-mount tray. You can use the rack-mount tray to install the vEdge
1000 router if you want to install two vEdge routers in the same slot in a 19-inch rack or if you want to mount
the router on all four posts of the rack. See Install the vEdge 1000 Router .
Table 32:
Item
Height
Width
Depth
Router Components
For a description of the vEdge 1000 router components, read these articles:
Front Panel Components Transceiver Modules Ports and Connectors Power Supply and Cooling System
Field-Replaceable Units

Front Panel Components

This article describes the LEDs, reset button, and the SD card slot on the front panel of the vEdge 1000 router.
See Chassis Views for the location of all components on the front panel of the router.
LEDs
The vEdge 1000 router has four chassis status LEDs located in the center of the front panel next to the USB
ports. See Figure 1.
Figure 1: Chassis Status LEDs in a vEdge 1000 Router
Specification
18.9 in. (48 cm)
1.75 in. (4.45 cm)
22.36 in. (56.8 cm) including the cable management ears
Specification
80K hours
AS/NZS 60950-1 CAN/CSA 60950-1
CB-IEC60950-1 CE Marking EN 60950-1
UL60950-1
AS/NZS CISPR22 Class A EN 300 386 EN 55022
Class A FCC Class A ICES Class A VCCI Class A
ROHS 6/6
Hardware Installation Guide for vEdge Routers
Front Panel Components
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents