Cisco vEdge Series Hardware Installation Manual page 139

Table of Contents

Advertisement

vEdge 1000 Router
Install the vEdge 1000 Router
3. Gradually remove the accessory box and the packing foam holding the router and the accessories in place.
See Figure 1.
4. Take out the router and each accessory.
5. Verify the router components against the packing list included in the box (see packing list below).
Figure 1: Unpacking the vEdge 1000 Router
Note: It is recommended that you do not discard the shipping carton and packing material when you unpack
the router. Flatten and store the box in case you need to move or return the router in the future. See Return
Hardware .
Packing List for a vEdge 1000 Router
The cardboard carton in which the router is packed includes a packing list. Check the parts you receive with
your router against the items on the packing list. The packing list specifies the part number, name, and quantity
of each item in the carton.
Hardware Installation Guide for vEdge Routers
133

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents