Cisco vEdge Series Hardware Installation Manual page 128

Table of Contents

Advertisement

Ports and Connectors
Color
Yellow
Alternating green and
yellow
Off
Table 3 describes the LAN/WAN LED on the network ports.
Table 39:
Color
State & Description
Green
Management Port
The management Ethernet port on a vEdge 1000 router uses an RJ-45 connector to connect to a management
device for out-of-band management.
The management port uses an autosensing RJ-45 connector to support a 10/100/1000Base-T connection. The
two LEDs on the port indicate link/activity on the port as well as the link speed status of the port. See
Management Port LEDs below.
Table 4 provides the pinout information for the RJ-45 connector for the management port.
Table 40:
P i n
Signal
1
TRP1+
2
TRP1-
3
TRP2+
4
TRP3+
5
TRP3-
Hardware Installation Guide for vEdge Routers
122
State & Description
• Blinking—The link is negotiated and active at a speed of 10M/100M, and
there is link activity.
• On steadily—The link is negotiated and active at a speed of 10M/100M,
but there is no link activity.
• An SFP has been detected in the port.
• The port and link are not active.
• On steadily—The port is configured as a WAN
port.
• Off—The port is configured as a LAN port.
Description
Transmit/receive data pair
1
Transmit/receive data pair
1
Transmit/receive data pair
2
Transmit/receive data pair
3
Transmit/receive data pair
3
vEdge 1000 Router

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents