Valor H6 Series Installation And Owner's Manual page 30

Direct vent zero clearance gas fireplaces
Hide thumbs Also See for H6 Series:
Table of Contents

Advertisement

QUALIFIED
INSTALLER
Venting Considerations— Vertical Takeoff
Note: Min. 24" total
rise required
Venting Considerations—Horizontal Takeoff
Note: Min. 24" total
rise required
30
Framing Requirements
24" pipe section
Fireplace -
Left Side View
24" pipe section
Fireplace -
Left side view
*
Notes—ALL venting considerations
• Dimensions of venting are based on
using Dura-Vent elbows. Elbow curve
radius dimensions will vary when using
other brands. In general, other brands
have slightly bigger radius.
• 3 inches clearance to combustibles
required above horizontal pipe. Slope
horizontal pipe upwards 1/4 inch per foot.
1 inch clearance required around sides
and bottom of horizontal pipe and around
vertical pipe.
• When calculating eff ective pipe lengths
subtract approximately 1-1/2 inch for
pipe joint - for example, a 12 inches pipe
section will add approximately 10-1/2
inches overall.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H6 1400knH6 1400kp

Table of Contents