Scope Of Delivery And Requirements - Siemens SIMATIC CC712 Operating Instructions Manual

Industrial ethernet - cloudconnect
Table of Contents

Advertisement

Application and functions

1.7 Scope of delivery and requirements

1.7
Scope of delivery and requirements
Scope of delivery
The following positions ship with the gateway:
● Gateway "CloudConnect 7"
● Terminal block for power supply of the gateway
● Data storage medium with documentation
Required accessories
The following accessories (which do not ship with the product) are required for gateway
operation:
● Power supply
You need a 24 V DC external voltage source.
● PC
To configure the gateway, you need a configuration PC with suitable Web browser (see
below).
● LAN cable
For the connection of the configuration PC to the X2 LAN interface of the gateway, you
need a Cat 5 ITP cable.
Communication partner
● Process access
For process access you need a station in productive operation, alternatively:
– S7 station
– Modbus station
● Cloud access / OPC clients
– For cloud access, you need the access set up to a cloud broker.
– You need at least one set up OPC UA client for connection via OPC.
Requirements in the S7 stations
The following requirements need to be met in your STEP 7 project or in the connected S7
stations.
● Tags / symbols
For access to the process data, tags or symbols must be created in the relevant CPU.
STEP 7 Professional: The "Optimized block access" option must be disabled in DBs. For
further details, see section Data points (Page 78).
18
Operating Instructions, 05/2019, C79000-G8976-C503-01
SIMATIC CC712

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents