Emerson Daniel 3410 Series Installation Manual page 55

Gas ultrasonic flow meters
Hide thumbs Also See for Daniel 3410 Series:
Table of Contents

Advertisement

Installation manual
DAN-20057315
7. Verify the field connections are working correctly. Allow the system to run for the
8. Power down the system and apply the sealing compound to the conduit and allow
9. If required, install the security latches and wire seals on the Transmitter Electronics
10. If required, install the wire seals through the socket head bolts on the Base
11. Re-apply electrical power to the system.
3.4.2
Startup for systems that use flame-proof cable
HAZARDOUS VOLTAGE INSIDE
Do not open the Transmitter Electronics Enclosure when an explosive gas atmosphere is
present. Disconnect equipment from supply circuit before opening the enclosure.
Failure to remove power may result in serious death or injury.
Procedure
1. Check to make certain that all field wiring power is turned OFF.
2. Remove the end cap nearest the cable entries to gain access to the transmitter
3. Install the cable and cable gland.
4. Complete the field connection wiring and apply electrical power to the system.
5. Set or configure the meter operating parameters using Daniel MeterLink. For
6. Verify the field connections are working correctly. Allow the system to run for the
7. Power down the system and apply the sealing compound to the conduit and allow
8. If required, install the security latches and wire seals on the Transmitter Electronics
9. If required, install the wire seals through the socket head bolts on the Base
10. Re-apply electrical power to the system.
Model 3418 GUSM
Engineering
drawings), Daniel MeterLink Software for Gas and Liquid Ultrasonic Meters
Quick Start Manual (P/N 3-9000-763) and use the Daniel MeterLink Field Setup
Wizard to complete the configuration.
time specified by the customer (usually one week) and an electrician has fully tested
the connections. After the Acceptance Test is witnessed and approved, seal the
conduit.
to set in accordance with manufacturer specifications.
Enclosure end caps (see
Enclosure (see
Base enclosure security
WARNING
electronics.
additional installation information refer to the system wiring diagram (see
Engineering
drawings), Daniel MeterLink Software for Gas and Liquid Ultrasonic Meters
Quick Start Manual (P/N 3-9000-763) and use the Daniel MeterLink Field Setup
Wizard to complete the configuration.
time specified by the customer (usually one week) and an electrician has fully tested
the connections. After the Acceptance Test is witnessed and approved, seal the
conduit.
to set in accordance with manufacturer specifications.
Enclosure end caps (see
Enclosure (see
Base enclosure security
Seal transmitter electronics
seals).
Seal transmitter electronics
seals).
Electrical installation
June 2019
enclosure).
enclosure).
55