Parts With Ground Mounting Set; Figure 3 Opt100 Front Parts With Ground Mounting Set - Vaisala Optimus OPT100 Installation Manual

Dga monitor for transformers
Hide thumbs Also See for Optimus OPT100:
Table of Contents

Advertisement

OPT100 Installation Guide
2. Using the assembled mounting stand as the template, mark the locations of the six
anchors on the mounting surface.
3. Drill holes for the anchors using an impact drill and an 8 mm (.315 in) drill bit. The holes
must be 60 mm (2.36 in) deep.
4. Install the anchors in the holes.
5. Attach the mounting stand to the anchors.
6. Verify that the mounting stand is securely anchored.
7. Attach DGA monitor to the top of the mounting stand.
8. Tighten the screws to 20 Nm tightness.
3.2.1 Parts with Ground Mounting Set
1
2
3
4
5
6
7
18
Figure 3 OPT100 Front Parts with Ground
Mounting Set
1
Status LEDs
2
OPT100 DGA Monitor
3
Door lock (3 pcs)
4
Power supply unit
5
Door lock
6
Mounting stand
7
Wedge anchors (6 pcs)
M211857EN-F

Advertisement

Table of Contents
loading

Table of Contents