Installation Phases; Required Personnel - Vaisala Optimus OPT100 Installation Manual

Dga monitor for transformers
Hide thumbs Also See for Optimus OPT100:
Table of Contents

Advertisement

OPT100 Installation Guide
CAUTION!
below heat up during normal operation. Avoid touching hot surfaces and wear
protective gloves when working inside the enclosure. Whenever possible, allow
the DGA monitor to cool down before starting the work.
Wear protective eyewear and gloves.
Follow the safety regulations of the installation site.
The safety of any system incorporating this equipment is the responsibility of the
assembler.
2.2 Installation Phases
Perform the installation of the DGA monitor in the following phases:
• Planning
• Mechanical installation
• Electrical installation
• Commissioning
• Installation verification
These phases correspond to chapters of the Installation Guide. As part of the final installation
verification phase, use the provided installation checklists to make sure you have done all of
the required installation steps.
2.3 Required Personnel
Installation of the DGA monitor requires two persons. While most of the installation and
commissioning tasks can be done by a single person, safe carrying and lifting of the DGA
monitor requires two persons.
Installers must have the necessary training to legally perform all required tasks. For example,
connecting the DGA monitor to mains power must be done by a licensed electrician.
8
Surfaces inside DGA monitor that are marked with the symbol
M211857EN-F