Vaisala Optimus OPT100 Installation Manual page 63

Dga monitor for transformers
Hide thumbs Also See for Optimus OPT100:
Table of Contents

Advertisement

Chapter 5 – Commissioning
3. Before leaving the installation site, perform a safety check and lock up according to the
Safety Checklist (page
63).
Keep the doors closed and locked when not actively working inside the
enclosures or accessing the service port locally. Keeping the DGA monitor
door closed when performing measurement is also important for
temperature management of measurement components.
61

Advertisement

Table of Contents
loading

Related Products for Vaisala Optimus OPT100

Table of Contents