M211857EN-A Installation Guide Vaisala Optimus ™ DGA Monitor for Transformers OPT100 DRAFT 24 May 2017...
Page 2
This product contains software developed sold or disclosed to a third party without by Vaisala or third parties. Use of the prior written permission of the copyright software is governed by license terms and holder. Translated manuals and translated...
Table of Contents Table of Contents About This Document..................5 Version Information....................5 Planning The Installation...................7 Installation Safety....................7 Installation Phases....................8 Required Personnel....................8 Required Materials....................9 Recommended Tools................... 10 Storing and Transporting the DGA Monitor............11 Preparations for Reinstalling a DGA Monitor............. 11 Installation Site Requirements................
Page 4
OPT100 Installation Guide M211857EN-A List of Figures Figure 1 Possible Locations of Oil Connections............13 Figure 2 Assembly of the Mounting Stand..............16 Figure 3 OPT100 Front Parts with Ground Mounting Set........17 Figure 4 OPT100 Rear Parts with Ground Mounting Set..........18 Figure 5 OPT100 Dimensions with Ground Mounting Set........
Chapter 1 – About This Document 1. About This Document 1.1 Version Information Table 1 Document Versions Document Code Date Description M211857EN-A First version.
Chapter 2 – Planning The Installation 2. Planning The Installation 2.1 Installation Safety WARNING! Read the installation instructions carefully before installing the product. If you encounter the following marking during installation, consult product documentation to find out the nature of the potential hazards and any actions which have to be taken to avoid them: WARNING! Only licensed experts may install electrical components.
OPT100 Installation Guide M211857EN-A CAUTION! Surfaces inside the DGA monitor that are marked with the symbol below heat up during normal operation. Avoid touching the hot surfaces and wear protective gloves when working inside the enclosure. Whenever possible, allow the device to cool down before starting the work.
Applicable legislation and site safety guidelines may require additional personnel to be present in the installation. 2.4 Required Materials In addition to the items delivered by Vaisala, installation of the DGA monitor requires various materials that you must supply yourself. Items Delivered by Vaisala •...
OPT100 Installation Guide M211857EN-A • Shielded outdoor Ethernet cable with a RJ-45 connector for the permanent Ethernet connection • Laptop computer with: • RJ-45 Ethernet connector • Web browser (Google Chrome, Microsoft Internet Explorer, or Mozilla Firefox) • Ethernet cable with RJ-45 connectors for temporary use Oil Pipe Construction The amount of required oil pipe construction materials depends on the intended pipe length.
Operation in cold environments may require trace heating elements and thermal insulation to be placed over the exposed sections of the oil pipes. If you have any questions, contact Vaisala for more information. Performing a site inspection in person is a good idea. Take photographs of the intended installation location, oil connections, and electrical connections.
Page 14
OPT100 Installation Guide M211857EN-A • There must be enough room and suitable supporting structures to install the DGA monitor in a vertical orientation. The DGA monitor must not be tilted more than 5 degrees. • If the Ground Mounting Set will be used to install the DGA monitor, there must be a level concrete surface that is at least 100 mm thick.
Chapter 2 – Planning The Installation 2.8.2 Recommended Locations of Oil Connections You must build two oil lines between the DGA monitor and the transformer: one for intake of fresh oil, and an outlet line for returning the measured oil. Make sure you have appropriate adapters for connecting the oil lines to the valves.
Page 16
OPT100 Installation Guide M211857EN-A DGA monitor needs to pump oil in both directions during initialization and maintenance. To make sure this is possible, check that: • Intake and outlet valves are both below oil level in the transformer. There should be no risk of drawing gas into the pipes even when the flow is reversed.
3.2 Mounting with Ground Mounting Set • Ground Mounting Set (Vaisala item OPTMSET2) • Mounting stand (delivered in three parts) • Wedge anchors (6 pcs) for securing the mounting stand to ground •...
OPT100 Installation Guide M211857EN-A Figure 2 Assembly of the Mounting Stand Mounting holes on the top are for attaching the DGA monitor. Mounting holes on the side join the parts of the mounting stand together. Holes on the bottom (three on each side) are for anchoring the mounting stand to the ground.
Chapter 3 – Mechanical Installation 7. Attach the DGA monitor to the top of the mounting stand. 8. Tighten the screws to 20 Nm tightness. 3.2.1 OPT100 Parts with Ground Mounting Set Figure 3 OPT100 Front Parts with Ground Mounting Set Status LEDs OPT100 DGA Monitor Door lock (3 pcs) Power Supply Unit...
OPT100 Installation Guide M211857EN-A Figure 4 OPT100 Rear Parts with Ground Mounting Set Radiation shield Cable glands and oil connections for DGA Monitor Cable glands for power supply unit...
Chapter 3 – Mechanical Installation 3.2.2 OPT100 Dimensions with Ground Mounting Set Dimensions are in millimeters and inches (in brackets). 453 (17.8) 675 (26.6) Figure 5 OPT100 Dimensions with Ground Mounting Set...
OPT100 Installation Guide M211857EN-A 3.3 Mounting with Wall Mounting Set • Wall Mounting Set (Vaisala item OPTMSET1) • Installation beam (2 pcs) • Cradle for Power Supply Unit • Screws and washers • 6 mm hex key 1. Attach one of the installation beams to the mounting location, at a height where you want the top of the OPT100 enclosure to be.
Page 23
Chapter 3 – Mechanical Installation 6. Add a second screw (with washer) below each of the installed screws, and tighten them. The enclosure is now secured to the installation beams by a total of eight screws. The second set of mounting holes at the ends of the installation beam is used to secure the radiation shield.
OPT100 Installation Guide M211857EN-A 3.3.1 OPT100 Parts with Wall Mounting Set Figure 6 OPT100 Front Parts with Wall Mounting Set Status LEDs OPT100 DGA Monitor Door lock (3 pcs) Power supply unit Door lock Figure 7 OPT100 Rear Parts with Wall Mounting Set Installation beam (upper) Radiation shield Installation beam...
Chapter 3 – Mechanical Installation 3.4 Installing the Oil Lines • Adapters for connecting the oil pipes to the valves on the transformer • Adapters for connecting the oil pipes to the DGA monitor (if not using recommended oil pipe size). For 3/8 inch pipe, use Swagelok â adapter SS-600-R-10M. •...
OPT100 Installation Guide M211857EN-A 4. Measure the distance from the oil valves to the DGA monitor, and plan the length and shape of the oil pipe sections. Minimize the amount of joints. 5. Cut and bend the oil pipe to appropriate sections for building the oil lines. 6.
Support the power supply unit and cradle and attach them to the bottom of the OPT100 enclosure. 3.6 Attaching the Radiation Shield • Radiation Shield (Vaisala item OPTSHLD1) • Radiation shield (delivered in three parts) • Screws and washers 1. Attach the radiation shield to the OPT100 enclosure: a.
Chapter 4 – Electrical Installation 4. Electrical Installation 4.1 Cable Glands and Connectors Figure 8 OPT100 DGA Monitor Cable Glands and Connectors Oil Out: connection for oil return line Oil In: connection for oil intake Ground terminal RS-485: cable gland for RS-485 connection Relay control out: cable gland for relay control to power supply unit DC in: 24 VDC connection from power supply unit Ethernet: external RJ-45 connector for permanent Ethernet connection...
OPT100 Installation Guide M211857EN-A Figure 9 OPTPSU1 Power Supply Unit Cable Glands and Connectors Ground terminal AC in: Mains power input. 100 ... 240 VAC, 50 ... 60 Hz, 10 A Spare Spare Relay out: Relay output. Max 250 VAC, 10 A Relay control in: Relay control from DGA monitor DC out: DC out to DGA monitor.
Chapter 4 – Electrical Installation 4.3 Connecting DC Power to DGA Monitor • DC power cable (Vaisala cable CBL210544) • 3 mm slotted screwdriver • Adjustable wrench 1. Open the cable gland marked DC in on the DGA monitor. Remove the plug and store it for later use.
10. Inside the power supply unit, connect the wires to terminal X5: Table 3 Terminal Block X5 Wiring Signal Wire Color Terminal Vaisala Cable CBL210544 24 VDC + Black with red marking 24 VDC - Black Ground Green/yellow Figure 11 Terminal Block X5 Wiring...
Chapter 4 – Electrical Installation 4.4 Connecting Relay Control to Power Supply Unit • Relay control cable (marked RELAY, Vaisala cable CBL210539) • 3 mm slotted screwdriver • Adjustable wrench 1. Open the cable gland marked Relay control out on the DGA monitor. Remove the plug and store it for later use.
M211857EN-A 5. Inside the DGA monitor, connect the wires to terminal block Y2: Table 4 Terminal Block Y2 Wiring Signal Wire Color Terminal Vaisala cable CBL210539 Relay 1 control + White Relay 1 control - Brown Relay 2 control + Green...
Chapter 4 – Electrical Installation 10. Inside the power supply unit, connect the wires to terminal block X4: Table 5 Terminal Block X4 Wiring Signal Wire Color Terminal Vaisala cable CBL210539 Relay 1 control + White Relay 1 control - Brown Relay 2 control +...
Page 36
OPT100 Installation Guide M211857EN-A The default settings of the RS-485 line are: • Serial settings 19200, 8, E, 1 • Modbus RTU slave • MAC address 240 1. Open the cable gland marked RS-485 on the DGA monitor. Remove the plug and store it for later use.
Chapter 4 – Electrical Installation 5. Inside the DGA monitor, connect the wires to terminal block Y1: Verify the wiring colors of your cable before making any connections. Table 6 Terminal Block Y1 Wiring Signal Terminal RS-485 + RS-485 - Common Figure 14 Terminal Block Y1 Wiring Example 4.6 Connecting Ethernet •...
OPT100 Installation Guide M211857EN-A Ethernet connector ETH1 inside the DGA monitor is intended for temporary local use only. For a permanent network connection, use the Ethernet connector under the DGA monitor. 1. Assemble the protection shell over the RJ-45 connector on your Ethernet cable. Assemble according to Code A: see instructions on top of the bag that contains the parts.
Chapter 4 – Electrical Installation 3. Insert the relay cable through the outer nut and the inner seal, and start inserting the cable through the cable gland. Stop when you reach the section of the cable where the metal braid is exposed. 4.
OPT100 Installation Guide M211857EN-A 4.8 Connecting AC (Mains) Power • AC power cable with 2.5 mm (AWG10) wires and 9 ... 16 mm external diameter. Must be compliant with local regulations for mains power cables. • Cable stripping tool • 3 mm slotted screwdriver •...
Page 41
Chapter 4 – Electrical Installation 3. Make sure the external disconnection device is turned off. If possible, lock it in the off position. 4. Run the AC cable between the external disconnection device and the power supply unit of the DGA monitor. 5.
OPT100 Installation Guide M211857EN-A 10. Inside the power supply unit, connect the wires to terminal block X1: Wiring colors may be different depending on your cable. Table 8 Terminal Block X1 Wiring Signal Wire Color Terminal Line Brown Neutral Blue Ground Green/yellow Figure 16 Terminal Block X1 Wiring 11.
Page 43
Chapter 4 – Electrical Installation To maintain enclosure tightness and provide strain relief to the cables, all cable glands on the DGA monitor and the power supply unit must be tightened. Unused cable glands must remain plugged. 1. Check every cable gland that is in use: a.
Chapter 5 – Commissioning 5. Commissioning 5.1 Turning On the DGA Monitor CAUTION! Verify that the DGA monitor is fully wired and grounded before turning it on. 1. Turn on AC power from the external disconnection device. 2. Turn on the circuit breaker F1 Main and switch S1 inside the power supply unit. 3.
OPT100 Installation Guide M211857EN-A 4. Enter the unique administration password for this OPT100 DGA Monitor. The password is included in the OPT100 delivery documentation. 5. Select Log in. The user interface opens in your browser. 5.3 Initializing the DGA Monitor • 5 mm hex key Before starting the initialization, make sure that: •...
Chapter 5 – Commissioning 5.4 Starting Measurement Mode In the measurement mode the DGA monitor repeats the measurement cycle continuously. Before starting the measurement mode, make sure that: • DGA monitor has been successfully initialized and is currently in standby mode. 1.
Chapter 6 – Installation Verification 6. Installation Verification 6.1 Installation Checklist Fill in the checklist and save it to record the tasks you have carried out. Make copies of the list when needed. Installation Preparations Recommended tools available Required materials and installation accessories available Installation site safety requirements met DGA monitor installation location selected Oil intake and outlet connection valves available...
OPT100 Installation Guide M211857EN-A Electrical Installation Relay control cable installed between DGA monitor and power supply unit Relay connections made to power supply unit (if needed) All unused cable glands blocked Cable glands tightened Commissioning DGA monitor turned on Oil intake and outlet connection valves open Connection to service interface OK Pipe plug removed from bleed valve Manual bleed valve override open...
Page 51
Chapter 6 – Installation Verification Safety Power supply unit housing closed and locked DGA monitor installation location Transformer Inspection date Inspected by Comments...
Technical Support Contact Vaisala technical support at helpdesk@vaisala.com. Provide at least the following supporting information: • Product name, model, and serial number • Name and location of the installation site • Name and contact information of a technical person who can provide further information on the problem For more information, see www.vaisala.com/support.