Carrying Out Quick Commissioning - Siemens Sinamics CU240D-2 DP Operating Instructions Manual

Sinamics g120d distributed inverter control unit with encoder evaluation
Hide thumbs Also See for Sinamics CU240D-2 DP:
Table of Contents

Advertisement

5. When the USB interface is appropriately set, then the "Accessible nodes" screen form
shows the inverters that can be accessed.
If you have not correctly set the USB interface, then the following "No additional nodes
found" message is displayed. In this case, follow the description below.
6. Transfer the inverter into the project using the menu: "Online - Upload device as new
station (hardware and software)".
You have transferred an inverter accessible via the USB interface into your project.
Procedure
1. Select your project and go online:
2. In the following screen form, select the inverter with which you wish to go online.
3. Once you are online, select "Commissioning" → "Commissioning Wizard":
You have started the commissioning Wizard of the inverter.
5.5.3

Carrying out quick commissioning

Procedure
Select whether the inverter is connected to a higher-level control via the fieldbus.
Select whether the ramp-function generator for the speed setpoint is implemented in the
higher-level control or in the inverter.
Select the control mode.
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF
Commissioning
5.5 Quick commissioning with a PC