Siemens Sinamics CU240D-2 DP Operating Instructions Manual page 46

Sinamics g120d distributed inverter control unit with encoder evaluation
Hide thumbs Also See for Sinamics CU240D-2 DP:
Table of Contents

Advertisement

Installation
4.2 Electrical Installation
From the transformer
Second level distribution with PE equipotential bonding
Metal frame
Short connection from the PE terminal to the metal frame.
Electrical connection of motor cable shield and connector body.
Electrical connection of motor cable shield and motor terminal box via electrically conductive PG
gland.
Driven machine
Conventional grounding system.
Foundation ground
Figure 4-7
You find further information on the rules for EMC compliant installation on the Internet:
(http://support.automation.siemens.com/WW/view/en/60612658/0/en)
44
Standard, heavy-power PE conductors without special high-frequency properties.
Ensures low frequency equipotential bonding as well as protection against injury.
Grounding and high-frequency equipotential bonding measures in the drive system and
in the plant
EMC design guidelines
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics cu240d-2 pn-f ppSinamics cu240d-2 pn-f foSinamics cu240d-2 dp-fSinamics cu240d-2 pnSinamics cu240d-2 pn-f

Table of Contents