Siemens Sinamics CU240D-2 DP Operating Instructions Manual page 75

Sinamics g120d distributed inverter control unit with encoder evaluation
Hide thumbs Also See for Sinamics CU240D-2 DP:
Table of Contents

Advertisement

The inverter in PROFINET IO operation
Figure 4-18
The inverter supports the following functions:
● RT
● IRT: The inverter forwards the clock synchronism, but does not support clock
synchronism.
● MRP: Media redundancy, impulsed with 200 ms. Requirement: Ring topology
● MRPD: Media redundancy, bumpless. Requirement: IRT and the ring topology created in
the control
● Diagnostic alarms in accordance with the error classes specified in the PROFIdrive
profile.
● Device replacement without removable data storage medium
● Shared Device for Control Units with fail-safe functions
The inverter as Ethernet node
Figure 4-19
See also
http://support.automation.siemens.com/WW/view/de/19292127
(http://support.automation.siemens.com/WW/view/en/19292127)
PROFINET – the Ethernet standard for automation
(http://w3.siemens.com/mcms/automation/en/industrial-
communications/profinet/Pages/Default.aspx)
Converter with the control units CU240D-2
Operating Instructions, 04/2018, FW V4.9 SP10, A5E34262100B AF
The inverter in PROFINET IO operation
The inverter as Ethernet node
4.3 Connecting the inverter to PROFINET
Installation
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics cu240d-2 pn-f ppSinamics cu240d-2 pn-f foSinamics cu240d-2 dp-fSinamics cu240d-2 pnSinamics cu240d-2 pn-f

Table of Contents