Commissioning SINAMICS drives
8.2 Activate the factory settings
Figure 8-7
A message appears that a first commissioning is required.
Start the first commissioning with the operating sequences described in the following section.
66
Communication re-established
Commissioning Manual, 07/2007, 6FC5397-2AP10-3BA0
IBN CNC: NCK, PLC, drive