OIL COOLER
REMOVAL
1) Drain engine coolant.
2) Remove oil filter.
3) Disconnect hoses and remove oil cooler.
INSTALLATION
1) Install oil cooler with new gasket.
2) Tighten cooler stud stand to specified torque.
Tightening torque:
(a): 57.5 N·m (5.8 kg-m)
Sealant:
"A" : LOCTITE 572
3) Connect hoses and tighten oil filter to specified torque by using
special tool (A).
Special tool
(A): 09915-46510
Tightening torque:
(b): 14 N·m (1.4 kg-m)
4) Fill engine coolant.
5) Check engine oil level. Refer to section 0B.
6) Check for oil leakage.
1. Oil cooler
2. Gasket
3. Oil filter stand
WATER INLET BOX
REMOVAL
1) Drain engine coolant.
2) Disconnect hoses and remove water inlet pipe.
INSTALLATION
1) Install water inlet pipe with new O-ring.
2) Tighten water inlet pipe bolts.
Tightening torque:
(a): 20 N·m (2.0 kg-m)
3) Fill engine coolant.
1. Water inlet pipe
2. O-ring
ENGINE MECHANICAL (XUD9BSD ENGINE) 6A4-5