Installation Workflow

Installation Workflow
When installing the StorEdge system, follow this workflow to ensure all the components are connected 
and functioning correctly.
Step 1 - PV system installation - modules, power optimizers and inverter:
 
Power optimizers - as described in Installing the Power Optimizers on page 11.
l
 
Inverter - as described in Installing the Inverter on page 16.
l
Step 2 - Backed-up loads panel installation (required for Backup Power only): Refer to Connecting to 
the AC Grid and to Backed-up Loads on page 33.
Step 3 - Electricity Meter installation (required for Smart Energy Management only). Refer to 
Electricity Meter Installation on page 23. 
Step 4 - Connecting PV strings (DC) to the inverter - Refer to Connecting the Strings to the Inverter on 
page 26.
Step 5 - Connecting the battery to the inverter and mounting the battery. Refer to the installation 
information in the manufacturer documentation, and to StorEdge Inverter Connections on page 24.
Step 6 - Connecting AC and backed-up loads to the inverter - connect the   l oads (AC),   a nd meter. Refer 
to StorEdge Inverter Connections on page 24.
Step 7 - Commissioning the inverter - Activate the system and pair the power optimizers. Refer to 
Commissioning the Installation on page 34.
Step 8 - Connecting to the monitoring portal. Refer to Setting Up Communication to the Monitoring Portal 
on page 59.
Step 9 - System Configuration - Configuring the RS485 bus and StorEdge applications. Refer to System 
Configuration on page 67.
The following flowchart appears throughout this Installation Guide to assist with the installation steps:
10
SolarEdge StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1