SolarEdge StorEdge SE5000-xxS0 series Installation Manual page 22

For single battery or high capacity
Table of Contents

Advertisement

 5. Secure the StorEdge Connection Unit bracket to the wall:
Mark the location of the bracket screw for the StorEdge Connection Unit and drill the hole.
l
Fasten the bracket using a standard bolt.
l
Verify that the bracket is firmly attached to the mounting surface.
l
 6. Insert the two supplied screws through the outer heat sink fin on both sides of the inverter and into
the bracket (see Figure 8). Tighten the screws with a torque of 4.0 N*m / 2.9 lb.*ft.
 7. Remove the inverter cover: Open the inverter cover's six Allen screws and carefully pull the cover
horizontally before lowering it.
SolarEdge-StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
Figure 9: StorEdge Connection Unit bracket
Chapter 3: Installing the Inverter
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents