SolarEdge StorEdge SE5000-xxS0 series Installation Manual page 19

For single battery or high capacity
Table of Contents

Advertisement

Inverter Interfaces
All LEDs turn on while the inverter is being configured.
AC and DC conduit entries: Connection points of the StorEdge Connection Unit.
l
ON/OFF switch: Turning this switch ON starts the operation of the power optimizers, enables power 
l
production and allows the inverter to begin exporting power to the utility grid/backed-up loads. 
Turning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of 
power. When this switch is OFF, the inverter control circuitry remains powered up.
LCD light button: Pressing this button lights up the LCD for 30 seconds. In addition, you can press 
l
this button to view inverter status screens and access configuration menu options, as described 
Configuring the Inverter Using the LCD Light Button on page 46.
Two communication glands, for connection of inverter communication options. Each gland has 
l
three openings. Refer to Setting Up Communication to the Monitoring Portal on page 59 for more 
information.
DC Safety Switch:   d isconnects both the positive and negative conductors of the PV and the positive 
l
and negative conductors of the battery.
AC output: Cable glands for connection of grid and backed up loads
l
DC input: For connection of the PV installation and the battery
l
Communication and control gland:   f or connection of inverter communication options, meter, 
l
battery thermal power 12V and battery control.
18
SolarEdge StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
Figure 5: Inverter front view
Figure 6: StorEdge Connection Unit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents