Installing A New Storedge Connection Unit - SolarEdge StorEdge SE5000-xxS0 series Installation Manual

For single battery or high capacity
Table of Contents

Advertisement

 5. Disconnect the DC and AC wires from the inverter.   O pen the DC and AC wires   f errite beads and set
them aside.
 6. Disconnect the cable connecting the inverter digital board to the StorEdge Connection Unit.
 7. Unscrew the two conduit nuts in the inverter securing the StorEdge Connection Unit to the inverter.
 8. Open the StorEdge Connection Unit cover and disconnect:
Backed-up loads panel wires, if connected
l
External meter, if connected
l
 9. Release the bracket securing the StorEdge Connection Unit to the wall.
 10. Carefully remove the StorEdge Connection Unit with its mounting bracket from the wall.

Installing a New StorEdge Connection Unit

 1. Open the StorEdge Connection Unit cover.
 2. Position the new StorEdge Connection Unit below the inverter and from the inside of the inverter
grab the AC and DC wires extending from the unit conduits, as shown below:
 3. Attach the StorEdge Connection Unit with its bracket to the wall and slightly close the screws. Do not
over tighten.
 4. Reconnect the cable from the inverter digital board to the StorEdge Connection Unit.
 5. Reconnect all the external wires and ferrite beads.
 6. Securely screw the two conduit nuts onto the conduit ends in the inverter.   V erify proper conduit
sealing.
 7. Close the StorEdge Connection Unit cover. Attach the cover and secure it by tightening the six screws 
with a torque of 1.2 N*m / 0.9 ft.*lb.
SolarEdge-StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
Appendix C: Replacing and Adding System Components
Figure 48: Inserting the AC and DC conduits
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents