SolarEdge SE3000H-US Installation Manual

SolarEdge SE3000H-US Installation Manual

Single phase inverter with hd-wave technology
Hide thumbs Also See for SE3000H-US:
Table of Contents

Advertisement

Single Phase Inverter
with HD-Wave Technology
Installation Guide
For North America
Version 1.1

Advertisement

Table of Contents
loading

Summary of Contents for SolarEdge SE3000H-US

  • Page 1 Single Phase Inverter with HD-Wave Technology Installation Guide For North America Version 1.1...
  • Page 2: Disclaimers

    Disclaimers Disclaimers Important Notice Copyright © SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted, in any form or  by any means, electronic, mechanical, photographic, magnetic or otherwise, without the prior written  permission of SolarEdge Inc. The material furnished in this document is believed to be accurate and reliable. However, SolarEdge  assumes no responsibility for the use of this material. SolarEdge reserves the right to make changes to the  material at any time and without notice. You may refer to the SolarEdge web site  (http://www.solaredge.us) for the most updated version. All company and brand products and service names are trademarks or registered trademarks of their  respective holders. Patent marking notice: see   h ttp://www.solaredge.us/patent The general terms and conditions of delivery of SolarEdge shall apply. The content of these documents is continually reviewed and amended, where necessary. However,  discrepancies cannot be excluded. No guarantee is made for the completeness of these documents. The images contained in this document are for illustrative purposes only and may vary depending on  product models. FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant  to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful  interference in a residential installation. This equipment generates, uses and can radiate radio frequency  energy and, if not installed and used in accordance with the instructions, may cause harmful interference  to radio communications. However, there is no guarantee that interference will not occur in a particular  installation. If this equipment does cause harmful interference to radio or television reception, which can  be determined by turning the equipment off and on, you are encouraged to try to correct the  interference by one or more of the following measures:   Reorient or relocate the receiving antenna.   Increase the separation between the equipment and the receiver.   Connect the equipment into an outlet on a circuit different from that to which the receiver is  connected.  ...
  • Page 3: Revision History

      Overview section updated (system image , additional safety voltage initiator: Rapid Shutdown (PVRSS))   In Supported AC Grids,  added: Ground connection is required for all grids   In Power Optimizer Installation chapter:    Added grounding method testing information    Added: circuit conductors must be sized according to NEC 690.9 when combining strings   Removed reference to racking models and their grounding methods   Removed mentioning of tracker   In inverter Installation chapter:   In Inverter Interfaces - updated ON/OFF switch description, added warning regarding PVRSS   Added a caution about not altering the DC Safety Unit enclosure: SolarEdge does not permit  opening or puncturing the Safety Switch in any location other than the pre-defined drill guide  locations, or otherwise altering the construction of the enclosure, as this may compromise safety  and will void the warranty.    Connection to/from the Safety Switch:   AC grounding to bus-bar instead of terminal block - updated instructions and Safety Switch image   String fusing requirement note updated: Fuses needed for 4 strings or more (instead of 3).   Added conduit sealing requirement Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 4 Revision History   In Commissioning chapter:   Updated the activation sequence    Removed RS232 reference   Rapid shutdown (PVRSS):   Added important safety information notes and warnings   For a compliant PV Rapid Shutdown installation, use no more than 30 optimizers per string.   Enabling PVRSS from the inverter menu is only required if the installed optimizers were  manufactured before 2015, otherwise it is enabled by default.   Added testing PVRSS functionality after pairing   In Configuration Menu Options:   Communication section:    Removed RS232 Conf   Added GSM Conf   Power Control section:   Removed Phase Balance link and info   Added a note about compliance with UL 1741 Supplement A.   Added link to P(Q) diagram application note   Maintenance section:   Added links to application notes (Upgrading the inverter using SD card; Isolation fault  troubleshooting; Arc fault detection)  ...
  • Page 5: Support And Contact Information

    Support and Contact Information Support and Contact Information If you have technical problems concerning SolarEdge products, please contact us: USA and Canada:   1  510 498 3200 Worldwide:   + 972 073 2403118 Fax:   + 1 (530) 273-2769 Email:                                       upport@solaredge.us. Before contact, make sure to have the following information at hand: Model and serial number of the product in question.
  • Page 6: Table Of Contents

    Important Notice FCC Compliance Revision History Version 1.1 (July 2018) Support and Contact Information Contents HANDLING AND SAFETY INSTRUCTIONS Safety Symbols Information IMPORTANT SAFETY INSTRUCTIONS Chapter 1: Introducing the SolarEdge Power Harvesting System Power Optimizer SolarEdge Inverter Monitoring Platform Supported AC Grids Installation Procedure Installation Equipment List Inverter Transport and Storage Chapter 2: Installing the Power Optimizers Safety Package Contents...
  • Page 7 Contents Mapper Application Creating a Site in the   M onitoring Platform Paper Template Chapter 5: Configuring the Inverter LCD Buttons Inverter   C onfiguration – Setup Mode Configuration Menu Options Country and Grid Language Communication Power Control Display Maintenance Information Status Screens - Operational Mode Initial   S tatus Main Inverter Status Energy Meter Status Telemetry Status ID Status Server Communication Status IP Status ZigBee Status Cellular Status GSM Status Communication Ports Status Smart Energy Management Status Power Control Status Chapter 6: Setting Up Communication Communication Options Ethernet RS485...
  • Page 8 Contents Power Optimizer Troubleshooting Appendix B: Mechanical Specifications Mounting Brackets Type 1 Mounting Bracket Type 2 Appendix C: Replacing and Adding System Components Fuse Replacement Replacing an Inverter Replacing the DC Safety Unit Technical Specifica�ons - Single Phase Inverters with HD-Wave Technology Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 9: Handling And Safety Instructions

    HANDLING AND SAFETY INSTRUCTIONS HANDLING AND SAFETY INSTRUCTIONS During installation, testing and inspection, adherence to all the handling and safety instructions is  mandatory. Failure to do so may result in injury or loss of life and damage to the equipment. Safety Symbols Information The following safety symbols are used in this document. Familiarize yourself with the symbols and their  meaning before installing or operating the system. WARNING! Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could  result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions  are fully understood and met.  AVERTISSEMENT! Dénote un risque: il attire l'attention sur une opération qui, si elle n'est pas faite ou suivi correctement, pourrait causer des blessures ou un danger de mort.
  • Page 10: Important Safety Instructions

    IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS  CONSIGNES DE SÉCURITÉ IMPORTANTES  CONSERVEZ CES INSTRUCTIONS WARNING! The inverter cover must be opened only after shutting off the inverter ON/OFF switch located at the  bottom of the inverter. This disables the DC voltage inside the inverter. Wait five minutes before  opening the cover. Otherwise, there is a risk of electric shock from energy stored in the capacitors.  AVERTISSEMENT! Ne pas ouvrir le couvercle de l'onduleur avant d'avoir coupé l'interrupteur situé en dessous de l'onduleur. Cela supprime les tensions CC et CA de l'onduleur. Attendre que le LCD affiche une tension sécurisée (50V).
  • Page 11 IMPORTANT SAFETY INSTRUCTIONS WARNING! The   S afety Switch meets all requirements for a code-compliant installation of this system. The DC  Disconnect Switch disconnects both the positive and negative conductors. AVERTISSEMENT! Le sectionneur externe (inclus) repond aux exigences de conformité pour l’installation de ce système . Le coupeur CC ouvre les conducteurs positifs et négatifs. WARNING! The inverter input and output circuits are isolated from the enclosure. This system does not include an  isolation transformer and should be installed with an ungrounded PV array in accordance with the  requirements of NEC Articles 690.35 and 690.43 National Electric Code, ANSI/NFPA 70, 2011 (and  Canadian Electrical Code, Part I, for installations in Canada).  Equipment grounding is the responsibility of the installer and must be performed in accordance with all  applicable Local and National Codes. AVERTISSEMENT! Les circuits d’entrée et de sortie de l’onduleur sont isolés de l’enveloppe. Ce système n’inclut pas d’isolation galvanique (transformateur) et devra être installé...
  • Page 12 IMPORTANT SAFETY INSTRUCTIONS NOTE The symbol   appears at grounding points on the SolarEdge equipment. This symbol is also used in  this manual. NOTE A SolarEdge inverter may be installed in a site with a generator, however must not operate at the same  time as the generator. Operating an inverter and a generator simultaneously will void the warranty.  SolarEdge requires installing a physical or electronic interlock, which will prevent the generator and  inverter from operating simultaneously. Interlock procurement, installation, maintenance and support  are the responsibility of the installer. Damage to the inverter due to incorrect interlock installation or use  of an interlock that is incompatible with the SolarEdge system will render the SolarEdge warranty  invalid.  IMPORTANT SAFETY INFORMATION To perform Rapid Shutdown, shut down AC power to the inverter. This can be done by turning off the  AC breaker in the main service panel, which is an approved AC disconnect as described in the NEC. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 13: Chapter 1: Introducing The Solaredge Power Harvesting System

    Chapter 1: Introducing the SolarEdge Power Harvesting System Chapter 1: Introducing the SolarEdge Power Harvesting System The SolarEdge power harvesting solution maximizes the power output from any type of solar  Photovoltaic (PV) installation while reducing the average cost per watt. The following sections describe  each of the system’s components. Figure 1: The SolarEdge power harvesting system components Power Optimizer The   p ower optimizers are DC-DC converters connected to PV modules in order to maximize power  harvesting by performing independent Maximum Power Point Tracking (MPPT) at the module level. The power optimizers regulate the string voltage at a constant level, regardless of string length and  environmental conditions. The power optimizers include a safety voltage function that automatically reduces the output of each  power optimizer to 1 Vdc in the following cases:   During fault conditions  ...
  • Page 14: Monitoring Platform

    The following figures illustrate grids that are supported by SolarEdge single phase inverters. Refer to  Country and Grid on page 41).  Ground connection is required for all grids, as described in Connecting the AC Grid to the Safety Switch on  page 29. Note that in some cases L1 and L2 are not interchangeable. In these places, L1 and L2 locations appear in  the   d rawing. Figure 2: 240V AC grids supported by SolarEdge single phase inverter Figure 3: 208V AC grids supported by SolarEdge single phase inverter 1 208V AC grids are only supported by some inverter models. Refer to the specification supplied with the inverter. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 15: Installation Procedure

    Installation Procedure Installation Procedure The following is the procedure for installing and setting up a new SolarEdge site. Many of these also apply  to modification of an existing site.  1.  Connecting Power Optimizers in Strings, page 21.  2.  Recording power optimizer serial numbers (optional),   p age 36.  3.  Mounting the inverter, Page 25.  4.  Connecting the AC and the String to the DC Safety Unit, page 29.  5.  Commissioning and activating the installation, page 32.  6.  Connecting the inverter to the monitoring platform, page 37.  7.  Configuring the inverter, page 38. Installation Equipment List Standard tools can be used during the installation of the SolarEdge system. The following is a  recommendation of the equipment needed for installation:   Allen screwdriver for 3mm screw type for the inverter cover, side screws, and Safety Switch cover.   Standard flat-head screwdrivers set   Non-contact voltage detector    Cordless drill or screwdriver and bits suitable for the surface on which the inverter will be installed and  for opening the Safety Switch drill guides   Appropriate mounting hardware   ( for example: stainless bolts, nuts, and washers) for attaching:  ...
  • Page 16: Inverter Transport And Storage

    Chapter 1: Introducing the SolarEdge Power Harvesting System Inverter Transport and Storage Transport the inverter in its original packaging, facing up and without exposing it to unnecessary shocks.  If the original package is no longer available, use a similar box that can withstand the weight of the  inverter (refer to the inverter weight in the specification datasheet provided with the unit), has a handle  system and can be closed fully. Store the inverter in a dry place where ambient temperatures are -13°F - 140°F / -25°C - +60°C. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 17: Chapter 2: Installing The Power Optimizers

    Chapter 2: Installing the Power Optimizers Chapter 2: Installing the Power Optimizers Safety The following notes and warnings apply when installing the   p ower optimizers. Some of the following may  not be applicable to smart modules: WARNING! The metallic enclosure of the power optimizer must be grounded in accordance with the product's listing  and local and national codes. AVERTISSEMENT! L'enceinte métallique de l’optimiseur de puissance doit être mise à la terre en accord avec les régulations locales et nationales. WARNING! When modifying an existing installation, turn OFF the inverter ON/OFF switch, the  ...
  • Page 18: Package Contents

    Sinon, le système SolarEdge installé peut être dangereux ou causer des problèmes fonctionnels, tels que les défauts de terre, qui peuvent provoquer un arrêt de l’onduleur. Afin d'assurer la compatibilité mécanique entre les optimiseurs de puissance SolarEdge et les modules auxquels ils sont connectés:.
  • Page 19   Make sure to use power optimizers that have the required output conductor length:   Minimize the use of extensions between power optimizers.   You can use extension cables between rows and from the end of string to the inverter. Do not use extension cables between the modules and the power optimizers, or between two    power optimizers within a string.   The minimum and maximum string length guidelines are stated in the power optimizer datasheets.  Refer to the   D esigner for string length verification. The   D esigner is available on the SolarEdge website  at http://www.solaredge.us/products/installer-tools/site-designer#/.   Completely shaded modules may cause their power optimizers to temporarily shut down. This will  not affect the performance of the other power optimizers in the string, as long as the minimum  number of unshaded power optimizers connected in a string of modules is met. If under typical  conditions fewer than the minimum optimizers are connected to unshaded modules, add more  optimizers to the string.   Equipment grounding tightening torques: 4-6 AWG: 45 lb-in, 8 AWG:   4 0 lb-in, 10-14 AWG: 35 lb-in.                                    T o allow for heat dissipation, maintain a 2.5 cm / 1" clearance distance between the power optimizer ...
  • Page 20: Step 1: Mounting And Grounding The Power Optimizers

    L'enceinte métallique de l’optimiseur de puissance doit être mise à la terre en accord avec les régulations locales et nationales.   For mounting on a grounded metal rail: Use the provided 5/16'' stainless steel grounding star  washer between the railing and the flat side of the mounting bracket.   T he grounding washer  should break through the anodize coating of the railing to ensure low resistive connection. Apply  torque of 9.5 N*m / 7 lb*ft. See Figure 5. 1 Not applicable to smart modules. 2 These methods have been evaluated by a nationally recognized testing laboratory as part of the optimizer evaluation.  The SolarEdge-supplied grounding lug kit has been evaluated only for use with SolarEdge power optimizers.   I t is not  intended or listed to be used as a general purpose grounding lug with other electrical equipment. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 21 Step 1: Mounting and Grounding the Power Optimizers Figure 5: Power optimizer installation and grounding using a star washer   For mounting on rails with sliding nut fasteners: If the star washer cannot be used, use the  SolarEdge grounding plate (purchased separately) between the railing and the flat side of the  mounting bracket. Use mounting specific hardware as needed. Apply torque of 9.5 N*m / 7 lb*ft.  See Figure 6 Figure 6: Power optimizer installation and grounding using a grounding plate For mounting on un-grounded structures (such as a wooden structure): If the star washer or ...
  • Page 22: Step 2: Connecting A Pv Module To A Power Optimizer

    Chapter 2: Installing the Power Optimizers  6.  Record power optimizer serial numbers and locations, as described in Reporting and Monitoring  Installation Data on page 35. Step 2: Connecting a PV Module to a Power Optimizer NOTE Images are for illustration purposes only. Refer to the label on the product to identify the plus and  minus input and output connectors. For each of the poweroptimizers:   Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power  optimizer.   Connect the Minus (-) output connector of the module to the Minus (-) input connector of the  power optimizer. Figure 8: Power optimizer connectors Step 3: Connecting Power Optimizers in Strings You can construct parallel strings of unequal length, that is, the number of power ...
  • Page 23: Step 4: Verifying Proper Power Optimizer Connection

    Step 4: Verifying Proper Power Optimizer Connection When a module is connected to a power optimizer, the power optimizer outputs a safe voltage of 1V  (±0.1V). Therefore, the total string voltage should equal 1V times the number of power optimizers  connected in series in the string. For example, if 10 power optimizers are connected in a string, then 10V  should be produced. Make sure the PV modules are exposed to sunlight during this process. The power optimizer will only   t urn  ON if   t he PV module provides at least 2W.  In SolarEdge systems, due to the introduction of poweroptimizers between the PV modules and the  inverter, the short circuit current I  and the open circuit voltage V  hold different meanings from  those in traditional systems.  For more information about the SolarEdge   s ystem’s string voltage and current, refer to   and I  in SolarEdge Systems Technical Note, available on the SolarEdge website at:   the V http://www.solaredge.us/files/pdfs/isc_and_voc_in_solaredge_systems_technical_ note.pdf.  To verify proper power optimizer connection: Measure the voltage of each string individually before connecting it to the other strings or to the inverter.  Verify correct polarity by measuring the string polarity with a voltmeter. Use a voltmeter with at least  0.1V measurement accuracy. NOTE Since the inverter is not yet operating, you may measure the string voltage   a nd verify correct polarity  on the DC wires inside the Connection Unit.
  • Page 24: Chapter 3: Installing The Inverter

    One   i nverter   Mounting bracket kit   DC Safety Unit sealing cover   Installation guide (with activation card and instructions)   For built-in wireless communication, antenna and mounting bracket Identifying the Inverter Refer to the sticker on the inverter    t hat specifies its Serial Number and its Electrical Ratings.   P rovide the  serial number when contacting SolarEdge support. The serial number is also required when opening a  new site in the   m onitoring platform. Inverter Interfaces The following figure shows the inverter connectors and interfaces.  Figure 10: Inverter Interfaces   AC output: For connection of the AC grid DC input: For connection of the PV installation     ON/OFF switch: Turning this switch ON starts the operation of the power optimizers, enables power ...
  • Page 25: Opening Conduit Drill Guides

    Opening Conduit Drill Guides   Communication gland: For connection of inverter communication options. Refer to Setting Up  Communication     on page 52 for more information.   Drain valve: Drains any moisture that may be accumulated in the unit.   LCD panel: Displays inverter information and configuration parameters   LCD LEDs: Three LEDs located to the right of the LCD indicate the following inverter statuses: Color Description Functionality On - The inverter is producing power. Blinking - Standby mode. The inverter is in Standby mode until its  working voltage is reached. The inverter then enters Production  Green Power production mode and produces power.  Off - The inverter is not producing power. This may be during Night  mode, when the inverter ON/OFF switch is OFF or when an error  occurs. Blinking:  Communication and    Monitoring information is being received from a power  Yellow inverter shutdown optimizer.    The inverter is being shut down. On - There is an error. Refer to Errors and Troubleshooting on page ...
  • Page 26: Mounting The Inverter

    Chapter 3: Installing the Inverter  2.  Loosen the screws on the front cover of the Safety Switch , as shown below:   Figure 11: Opening the Safety Switch cover  3.  Remove the Safety Switch cover.   4.  Open the required AC and DC conduit drill guides according to the conduits used in the installation:  The drill guides are located at the bottom and sides of the enclosure, each with two sizes: ¾'' and 1''.  Open the required drill guides, taking care not to interfere with any of the internal components. It is  recommended to use a Unibit drill. Figure 12: Safety Switch drill guides NOTE Unused conduit openings and glands should be sealed with appropriate seals. Mounting the Inverter The mounting brackets kit includes the following parts:   Two brackets for mounting on a wall/ pole (screws not included)   Two screws with washers for fastening the inverter brackets to the wall brackets. Figure 13: Mounting brackets and screws Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 27 SolarEdge inverters can be installed at a minimum distance of 50 m/ 164 ft from the shoreline of an  ocean or other saline environment, as long as there are no direct salt water splashes on the inverter. AVERTISSEMENT! Les onduleurs SolarEdge peuvent être installés à une distance minimum de 50m de la ligne d'eau de l'océan ou autre environnement salin, tant qu'il n'y a pas d'éclaboussements d'eau salée directs sur l'onduleur.  1. Determine the inverter mounting location, on a wall, stud framing or pole.   I t is recommended to mount the inverter in a location protected from direct sunlight.
  • Page 28 Chapter 3: Installing the Inverter  6.  Hang the inverter on the bracket: Lift the inverter from the sides, or hold it at the top and bottom of  the inverter to lift the unit into place. Do not lift holding the Safety Switch as it may be damaged.  Lower the inverter so that the notches on the inverter brackets are inserted in the holes of the wall  brackets, as shown below.   Figure 15: Hanging the inverter on the bracket  7.  Optionally, secure the DC Safety Unit bracket to the wall/pole, using 1-3 screws: NOTE In case of inverter replacement with the DC Safety Unit still mounted, it is recommended to use all  3 holes.  a.  Mark the location of the bracket screw for the Safety Switch, and optionally the two  additional bracket holes.   Figure 16: Safety Switch bracket  b.  Remove the inverter from the wall/ pole.  c.  Drill the hole for the Safety Switch bracket.  d.  Hang the inverter on the mounted brackets.  e.  Fasten the Safety Switch bracket using a standard bolt. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 29 Mounting the Inverter  8.  Insert the screws at the top of the inverter brackets and fasten the brackets together.  9.  Verify that all the brackets are firmly attached to the mounting surface. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 30: Chapter 4: Connecting The Ac And The Strings To The Safety Switch

      The hubs and other fittings must comply with UL514B.    Use the conduit and wiring appropriate for the installation location per the NEC. Outdoor  installations must use components that are rated NEMA 3R or higher.  NOTE For more wiring information refer to the SolarEdge Recommended AC Wiring Application Note , available on the SolarEdge website at http://www.solaredge.us/files/pdfs/application-note-recommended-wiring.pdf Connecting the AC Grid to the Safety Switch  1.  Remove the spring-clamp terminal instructions from inside the switch.  2.  Strip 05⁄16'' (8mm) of the AC wire insulation.  3.  Insert the AC conduit into the AC-side drill guide that was opened.
  • Page 31: Connecting The Strings To The Dc Safety Unit

    Connecting the Strings to the DC Safety Unit NOTE Connect the equipment grounding before connecting the AC wires to the AC terminal block.  Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA au bornier CA.  4. Connect the wires to the appropriate terminal blocks according to the labels on the terminal blocks  (N,  , L1 and L2).  5. Use a standard flat-blade screwdriver to connect the wires to the spring-clamp terminals: The screwdriver blade should fit freely in the terminal opening. Too large a blade can crack the  plastic housing. Insert the screwdriver and press the release mechanism and open the clamp. Insert the wire into the round opening and remove the screwdriver – the wire is automatically  clamped. Figure 18: AC Connection Verify that there are no unconnected wires.w  6.
  • Page 32 ATTENTION! Veillez à ce que le câble Plus (+) soit connecté au terminal + et que le câble - soit connecté au connecteur terminal. NOTE For systems with four PV strings per unit or more, fuses may need to be installed in  both the positive and negative conductors as required by NEC Article 690.9. For more  information, refer to the Technical Note   “ String Fusing Requirements in SolarEdge  Systems” at http://www.solaredge.com/files/pdfs/string_fusing_requirements.pdf. NOTE SolarEdge's fixed input voltage architecture enables the parallel strings to be of different lengths.  Therefore, they do not need to have the same number of power optimizers, as long as the length of  each string is within the permitted range.  5. Close the DC Safety Unit cover: Attach the switch cover and secure it by tightening the four screws  with a torque of 1.2     0 .9 ft.*lb.
  • Page 33: Chapter 5: Commissioning The Installation

    If LCD shows: Failed:   Turn AC OFF and ON (reset), and repeat the activation process.   Use the activation code that appears on the certification inverter label to manually activate the  inverter.   If the problem persists, contact SolarEdge Support. NOTE You can use the activation code that appears on the certification inverter label to activate  the inverter in case of a script error or a missing activation card.  4.   Verify that the inverter is configured to the proper country: Press the up or down buttons until  reaching the ID status screen:  D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4 C P U : 0 0 0 3 . 1 9 x x C o u n t r y : U S A 1 Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 34 - - - - - - - - - - - - - - - O F F  8.  Verify that the following information appears on the LCD panel:   P_OK: Appears only upon pairing process completion and first telemetry reception from the  power optimizers. Indicates connection to the power optimizers and that at least one power  optimizer is sending monitoring data.    000/000: Appears only upon first telemetry reception from the power optimizers. Indicates the  number of power optimizers that have been paired to this inverter.    S_OK: the connection to the SolarEdge monitoring platform is successful (should appear only if  the inverter is connected to the server). If S_OK is not displayed and the inverter is connected to  the server, refer to Errors and Troubleshooting on page 62. Vac [V]: the grid AC output voltage. Verify the correct value.      Vdc [V]: The DC input voltage of the longest string connected to the inverter.   T here should be a  safety voltage of 1V for each power optimizer in the string. NOTE A measurement error on the inverter  LCD of ±3 V is acceptable.  ...
  • Page 35: Step 2: Pairing Power Optimizers To The Inverter

    R e m a i n i n g [ s e c ] : 1 8 0  3.  Wait for the completion of the pairing (remaining seconds is 0). If pairing fails, an error is displayed. In  this case, repeat the pairing steps, and refer to Power Optimizer Troubleshooting  on page 68. If the  problem persists, contact SolarEdge Support. When pairing succeeds, the following message is  displayed: P a i r i n g P a i r i n g C o m p l e t e d The system startup process begins:...
  • Page 36: Step 3: Verifying Proper Activation

    Your SolarEdge power harvesting system is now operational. Reporting and Monitoring Installation Data NOTE This step requires connecting one of the communication options. Refer to Setting Up Communication  on page 52. The Monitoring System The monitoring platform   e nables accessing   s ite information, including up-to-date  information viewed in a physical or logical view. The monitoring platform is described in  detail in the   M onitoring Platform User Guide, available on the SolarEdge website at  http://www.solaredge.us/files/pdfs/solaredge-monitoring-platform-user-guide.pdf.  The   m onitoring platform can display logical and physical layouts of the installed system,  as follows:   Logical Layout: Shows a schematic logical layout of the components in the system, such as: inverters,  strings and modules, as well as their electrical connectivity. This view enables you to see which  modules are connected in each string, which strings are connected to each inverter, and so on. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 37: Providing Installation Information

      See how components are connected to each other.   Pair power optimizers remotely. To display a logical layout, insert the inverter  serial number in the new site created in the application.  When the communication between the inverter and the monitoring server is established, the logical  layout is displayed. To display a physical layout, you need to map the locations of the installed power optimizers. To generate  a physical mapping, use either the Site Mapper application or the physical layout editor in the monitoring  platform. The logical and physical mapping can be used for debugging a problem using the   m onitoring platform. If you do not report the physical and logical mapping of the installed power optimizers to SolarEdge, the   monitoring platform will show the logical layout indicating which power optimizers are connected to  which inverter, but will not show strings or the physical location of power optimizers . The inverter may be connected to the   m onitoring platform via LAN or by using a   Z igBee Gateway system  or a   C ellular Plug-in. Alternatively, you can use RS485 chain (bus) connection to connect   m ultiple  SolarEdge devices to one inverter that is already connected to the server, in a master/slave configuration.  Refer to Setting Up Communication     on page 52 . Providing Installation Information Use one of the following methods to connect your PV system to the monitoring platform. Mapper Application Android Use the Mapper smart-phone application     t o scan the power optimizer and inverter 2D bar-codes, and ...
  • Page 38: Creating A Site In The Monitoring Platform

    Chapter 5: Commissioning the Installation iPhone Use the Mapper smartphone application to scan the power optimizer and inverter 2D bar-codes. This  application creates an XML file that can be uploaded to the   m onitoring platform during site registration.  The Mapper can be downloaded from the application stores. For detailed information, refer to the Mapper Software Guide or to the Site Mapper demo  movie, available on the SolarEdge website at http://www.solaredge.us/groups/installer- tools/site-mapper.     Creating a Site in the Monitoring Platform Create the site in the monitoring platform using the registration form available at   https://monitoring.solaredge.us/solaredge-web/p/login. Fill out all required information  in the form, which includes information about your installation, as well as details about  its logical and physical mapping.   Paper Template Fill out the Physical Layout Template (downloadable from the SolarEdge site) using the  detachable 2D barcode stickers on each power optimizer. Once the form is completed,  scan it and upload the scanned file to the   m onitoring platform during site registration.  For an example paper template, refer to http://www.solaredge.us/files/pdfs/physical- layout-template.pdf.   Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 39: Chapter 5: Configuring The Inverter

    Chapter 5: Configuring the Inverter Chapter 5: Configuring the Inverter This chapter describes the interfaces to use for inverter configuration, and the configuration procedures.  LCD Buttons Use the   f our buttons located beneath the LCD panel for controlling the LCD menus, setting the inverter  configuration, and moving between the inverter status screens. To use the LCD buttons when the inverter cover is removed, touch the white dots on the LCD button  frame.         Figure 20: LCD buttons Use the four user buttons to control the LCD panel menus:   Esc: Moves the cursor (>) to the beginning of the currently displayed parameter; goes to the previous  menu, and cancels a value change with a long press (until Aborted is displayed).   Up (1) and Down (2): Moves the cursor from one menu option to another, moves among the  characters of a displayed parameter, and toggles between possible characters when setting a value. OK/Enter (3): Selects a menu option and accepts a value change with a long press (until Applied is    displayed). Use the three rightmost buttons Up, Down and OK sequentially for entering the Setup mode.  The LCD screen displays status information of the system and various menus for configuration options. ...
  • Page 40: Inverter Configuration - Setup Mode

    Chapter 5: Configuring the Inverter Inverter Configuration – Setup Mode After inverter installation, an installer may perform basic system configuration. Configuration is done  when the inverter is in Setup mode. To enter Setup mode:  1.  Turn the inverter ON/OFF switch to OFF (AC remains ON).  WARNING! If the inverter   w as operating properly (power was produced by the power optimizers), the  following message is displayed.  V O L T A G E N O T S A F E N O T D I S C O N N E C T V D C : 7 2 .
  • Page 41 Inverter Configuration – Setup Mode R S 4 8 5 – 1 C o n f < S > Z i g B e e C o n f < S > C e l l u l a r C o n f G P I O C o n f...
  • Page 42: Configuration Menu Options

      When selecting an option with No Neutral or No N, connection to Neutral line is not required.  For any other option, you must connect the Neutral line.  2.  Confirm your country selection in the confirmation screen: Toggle to YES and press Enter. Language  1.  Select the Language option to set the language in which the LCD should display.  2.  Confirm your language selection in the confirmation screen: Toggle to YES and press Enter. Communication  1.  Select the Communication option to define and configure:   The communication option used by   t he inverter  to communicate with the SolarEdge  monitoring platform    The communication option used to communicate between multiple   S olarEdge devices or  other external non-SolarEdge devices, such as energy meters or loggers.  2.  Select Server to set which communication method is used to communicate between   d evices and the   monitoring platform. Refer to Setting Up Communication     on page 52 for a full description of these  communication options. NOTE The Server menu shows only the communication options installed in the inverter. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 43 T y p e < S E > P r o t o c o l < M P S > D e v i c e I D < 1 > 1 When using the SolarEdge Cellular Plug-in with the provided SIM card, the Cellular Conf menu is unavailable. 2 When using the SolarEdge GSM products, RS232 Conf menu is unavailable. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 44: Power Control

    L o a d D e f a u l t s   Power control options are detailed in the Power Control Application Note, available on the SolarEdge  website at http://www.solaredge.us/files/pdfs/application_note_power_control_configuration.pdf. The Grid Control option may be disabled. Enabling it opens additional options in the  menu. The Energy Manager   o ption is used for setting power export limitation, as described in  the Export Limitation Application Note, available on the SolarEdge website at  https://www.solaredge.com/sites/default/files/export_limitation_application_note_ NA.pdf.   For P(Q) diagram refer to https://www.solaredge.com/sites/default/files/application_ note_p_q_diagram_of_se_inverters_en_and_na.pdf NOTE SolarEdge inverters with “Grid Support” functionality (as marked on the inverter certification label), are  compliant with UL 1741 Supplement A. The functionality is built into the inverter and no additional  external device is required.   1 When using the SolarEdge GSM products this menu is unavailable. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 45: Display

    G r i d P r o t e c t i o n B o a r d R e p l a c e m e n t   Date and Time: Set the internal real-time clock. If connected to the SolarEdge monitoring platform,  the date and time are set automatically and only time zone should be set.   Reset Counters: Resets the accumulated energy counters that are sent to the SolarEdge monitoring  platform  ...
  • Page 46: Information

    H a r d w a r e I D s Versions: Displays inverter firmware versions:     ID: The inverter ID.   DSP 1/2: The DSP digital control board firmware version   CPU: The communication board firmware version NOTE Please have these numbers ready when you contact SolarEdge Support.   Error Log: Displays the last five errors.   Warning Log: Displays the last five warnings. Hardware IDs: Displays the following HW serial numbers (if exist, and connected to the inverter):       ID:   t he inverter's ID    RGM1 (Revenue Grade Meter): A preassembled RGM or any external Energy Meter    ...
  • Page 47: Energy Meter Status

    X X X X X . X Status: Displays OK if the meter is communicating with the communication board.     <Error message>: If there is a meter error, it is displayed in this line.    Power (W): Depending on the meter type connected to the inverter, this line displays the exported  or imported power in Watts.   Energy (Wh): The total energy read by the meter, in Watt/hour. The value displayed in this line  depends on the meter type connected to the inverter and its location:   If a bidirectional meter is connected at the consumption point, this value is the consumed energy.   If the meter is installed at the production connection point, this value is the energy produced by  the site.   If the meter is installed at the grid connection point, this value is the energy exported to the grid. If the inverter is connected to the SolarEdge server, this value will also be displayed in the monitoring  platform. NOTE This data is accumulated according to an internal real-time clock.  Telemetry Status This screen displays the last power optimizer telemetry received. The display changes as each power  optimizer sends its telemetry. In order to verify proper installation, the installer may view the Telemetry window for some time in order  to observe the power optimizers' report process. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 48: Id Status

    < E R R O R M E S S A G E > NOTE If the connection method is CDMA (referred to as "Cellular" in the status screens) or GSM, the server  screen is replaced with the Cellular or GSM status screens (see Cellular Status on page 49 and  GSM Status on page 49).   Server: The method of connection to the SolarEdge monitoring platform.   S_OK: The connection to the SolarEdge monitoring platform is successful (should appear only if the   i s  connected to the server).   Status: Displays OK if the inverter established successful connection and communication with the  specified server port/ (LAN, RS485 or ZigBee Plug-in).   xxxxxxxx: Eight-bit Ethernet communication connection status: A string of 1s and 0s is displayed. 1  indicates OK, 0 indicates an error.     Error message, according to failure. Refer to Error Codes on page 63.
  • Page 49: Zigbee Status

    ZigBee Status 1 9 2 . 1 6 8 . 2 . 1 1 9 M S K 2 5 5 . 2 5 5 . 2 5 5 . 0 1 9 2 . 1 6 8 . 2 . 1 M A C 0 - 2 7 - 0 2 - 0 0 - 3 9 - 3 6 ZigBee Status...
  • Page 50: Cellular Status

    < O K > M N O : < X X X X X X > S i g : 5 < E r r o r m e s s a g e >   Server: The method of communication to the SolarEdge monitoring platform. Should display Cell.   Status: Displays OK if the inverter established a successful physical connection to the Cellular Plug-in. S_OK: The last communication to the SolarEdge monitoring platform was successful (appears if the    inverter is connected to the platform).  ...
  • Page 51: Smart Energy Management Status

    Smart Energy Management Status   PROT: The protocol type to which the port is set:   For a SolarEdge device: RS485 protocol ZigBee protocol S: SolarEdge slave M: SolarEdge master P2P: ZigBee point-to-point MPM: ZigBee multipoint master (for the   Z igBee gateway or    for load management by the inverter) MPS: ZigBee multipoint slave (for a ZigBee router card)   For electricity meters,   r efer to the application note - Connecting an Electricity Meter  to SolarEdge Devices at http://www.solaredge.com/files/pdfs/solaredge-meter- installation-guide-na.pdf.   SS: SunSpec - for a non-SolarEdge logger (monitoring and control) Smart Energy Management Status This screen is displayed only when Smart Energy Management is enabled. The screen shows energy details  of the site: S i t e L i m i t : 7 .
  • Page 52 Chapter 5: Configuring the Inverter   PWR Limit: The inverter maximum output power set by one of the power limiting options:    RRCR    Smart energy manager (Feed-in limitation)    P(f)   P(U)   Q(U)    Cos Phi: The ratio between active to reactive power    Power Prod: The power produced by the inverter  For more information, refer to the Power Control Application Note, available on the  SolarEdge website at http://www.solaredge.us/files/pdfs/application_note_power_ control_configuration.pdf. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 53: Chapter 6: Setting Up Communication

    MARCHE/ARRÊT soit en position ARRÊT, et le CA est en position MARCHE. Communication Options The following types of communication can be used to transfer the monitored information from the  inverter to the   m onitoring platform. Only communication products offered by SolarEdge are supported. Ethernet Ethernet is used for a LAN connection. For connection instructions refer to Creating an Ethernet (LAN)  Connection on page 55.  RS485 RS485 is   u sed for the connection of multiple SolarEdge devices on the same bus in a master-slave  configuration. RS485 can also be used as an interface to external   d evices, such as meters and third party  data loggers.   RS485-1: Enables the connection of multiple devices (inverters/Commercial Gateway) over the  same bus, such that connecting only one device to the Internet is sufficient to provide  communication services for all the devices on the bus.   RS485 Plug-in: The RS485 Plug-in provides an additional RS485 port for the  inverter for enhanced communications. The kit contains a module, which is ...
  • Page 54: Cellular

    Chapter 6: Setting Up Communication Cellular This wireless communication option   ( purchased separately) enables using a cellular  connection to connect one or several devices (depending on the data plan used) to the   monitoring platform.   The GSM Plug-in is provided with a user manual, which should be reviewed prior to  connection. Refer to https://www.solaredge.com/sites/default/files/cellular_gsm_ installation_guide.pdf ZigBee This option enables wireless connection of one or several devices to a   Z igBee Gateway,  for wireless communication to the monitoring platform. The   Z igBee Gateway is provided with an installation guide, which should be reviewed  prior to connection. Refer to https://www.solaredge.com/sites/default/files/se-zigbee- home-gateway-installation-guide.pdf. Communication Connector  A communication gland with multiple openings is used for connection of the various communication  options. The table below describes the functionality of each gland opening.   U nused openings should  remain sealed. Opening for cable size (diameter) Connection type 2.5 - 5 mm RS485 4.5 - 7 mm, with cut...
  • Page 55: Removing The Inverter Cover

    When removing the cover, make sure not to damage the internal components. SolarEdge will not be held  responsible for any components damaged as a result of incautious cover removal. ATTENTION! Lors du retrait du couvercle, assurez-vous de ne pas endommager les composants internes. SolarEdge ne peut être tenue pour responsable des composants endommagés à la suite d'une imprudence dans le retrait du couvercle. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 56: Creating An Ethernet (Lan) Connection

    Chapter 6: Setting Up Communication Figure 23: Removing the Inverter Cover Creating an Ethernet (LAN) Connection This communication option enables using an Ethernet connection to connect the inverter to the  monitoring platform through a LAN. Figure 24: Example of Ethernet connection Ethernet cable specifications:   Cable type – a shielded Ethernet cable (Cat5/5E STP) may be used   Maximum distance between the inverter and the router – 100 m/ 330 ft.  NOTE If using a cable longer than 10 m / 33 ft in areas where there is a risk of induced  voltage surges by lightning, it is recommend to use external surge protection  devices. For details refer to: http://www.solaredge.us/files/pdfs/lightning_surge_ protection.pdf.  Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 57 Creating an Ethernet (LAN) Connection To connect the Ethernet cable:  1.  Remove the inverter and Safety Switch covers as described in Removing the Inverter Cover on page 54.  2.  Open the communication gland #1. CAUTION! The gland includes a rubber waterproof fitting, which should be used to ensure proper sealing. ATTENTION! Le cote interne du gland contient une rondelle qui doit être utilisée pour une bonne étancheïté.  3.  Remove the plastic seal from one of the large openings.  4.  Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through  the gland opening in the inverter.  5.  Insert the cable through the opening in the Safety Switch towards the communication board.  6. ...
  • Page 58  7.  Use a pre-crimped cable to connect via gland #1 to the RJ45 plug on the inverter's communication  board or, if using a spool of cable, connect as follows:  a.  Insert the cable through the gland.  b.  Remove the cable’s external insulation using a crimping tool or cable cutter and expose eight  wires.  c.  Insert the eight wires into an RJ45 connector, as described in Figure 26  d.  Use a crimping tool to crimp the connector.  e.  Connect the Ethernet connector to the RJ45 port on the communication board. Figure 27: The RJ45 Ethernet connection  8.  For the switch/router side, use a pre-crimped cable or use a crimper to prepare an RJ45  communication connector: Insert the eight wires into the RJ45 connector in the same order as above  (Figure 26).   9.  Connect the cable RJ45 connector to the RJ45 port of the Ethernet switch or router.  You can connect more than one inverter to the same switch/router or to different switches/routers,  as needed. Each inverter sends its monitored data independently to the SolarEdge monitoring  platform. 1 The inverter connection does not support RX/TX polarity change. Supporting crossover Ethernet cables depends on the  switch capabilities. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 59: Creating An Rs485 Bus Connection

    AVERTISSEMENT! RISQUE D’ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur est retiré.  d.  Use the internal user buttons to configure the connection, as described in Communication on  page 41. NOTE If your network has a firewall, you may need to configure it to enable the connection to the  following address:    Destination Address: prod.solaredge.com   TCP Port: 22222 (for incoming and outgoing data)   11.  Verify the connection, as described in Verifying the Connection on page 61. Creating an RS485 Bus Connection The RS485 option enables creating a bus of connected inverters, consisting of up to 31 slave inverters and  1 master inverter. Using this option, inverters are connected to each other in a bus (chain), via their  RS485 connectors. The first and last inverters in the chain must be terminated as described on page 60. RS485 wiring specifications:  ...
  • Page 60 Chapter 6: Setting Up Communication The following sections describe how to physically connect the RS485 bus and how to configure the bus. To connect the RS485 communication bus:  1.  Remove the inverter cover as described in Removing the Inverter Cover on page 54.  2.  Remove the seal from one of the openings in communication gland  and insert the wire through the  opening.  3.  Pull out the 6-pin RS485 terminal block connector, as shown below:   Figure 28: The RS485 terminal block  4.  Loosen the screws of pins A(+), B(-), and G on the left of the RS485 terminal block (RS485-1 ). Figure 29: RS485 terminal block  5.  Insert the wire ends into the G, A and B pins shown above. Use Four- or six-wire twisted pair cable for  this connection.  You can use any color wire for each of the A, B and G connections, as long as:   The same color wire is used for all A pins the same color for all B pins and the same color for all G  pins  ...
  • Page 61  6.  For creating an RS485 bus - connect all B, A and G pins in all inverters. The following figure shows this  connection schema:     Figure 30: Connecting the inverters in a chain NOTE Do not cross-connect B, A and G wires.  7.  Tighten the terminal block screws.    8.  Check that the wires are fully inserted and cannot be pulled out easily.   9.  Push the RS485 terminal block firmly all the way into the connector on the right side of the  communication board.   10.  Terminate the first and last SolarEdge device  in the chain by switching a termination DIP-switch inside  the inverter to ON (move the left switch up). The switch is located on the communication board and  is marked SW2.    Figure 31: RS485 termination switch NOTE Only the first and last SolarEdge devices in the chain should be terminated. The other inverters in  the chain should have the termination switch OFF (down position).  11.  If not using surge protection, connect the grounding wire to the first inverter in the RS485 chain;  make sure the grounding wire is not in contact with other wires. For inverters with a DC Safety Unit,  connect the grounding wire to the grounding bus-bar in the DC Safety Unit. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 62: Verifying The Connection

    RISQUE D’ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur est retiré.  3.  Use the internal buttons to configure the connection (slightly touch the black square buttons). To set  the inverter designated as master, select the following in the LCD menus: Communication è Server è LAN,   Z igBee, or CDMA     RS485-1 Conf. è Device Type è SolarEdge   RS485-1 Conf. è Protocol è Master   RS485-1 Conf. è Slave Detect The system starts automatic detection of the   s lave inverters connected to the master inverter. The  inverter should report the correct number of slaves. If it does not, verify the connections and ...
  • Page 63: Appendix A: Errors And Troubleshooting

    Appendix A: Errors and Troubleshooting Appendix A: Errors and Troubleshooting This appendix describes general system problems, and how to troubleshoot them. For further assistance,  contact SolarEdge Support. Troubleshooting Communication Troubleshooting Ethernet Communication When using Ethernet communication, use the Server Communication Status window to identify the  location of the error: S e r v e r : L A N < S _ O K > S t a t u s : <...
  • Page 64: Troubleshooting Rs485 Communication

      Use the Long slave Detect to retry connecting to slaves Analyze the Slave List to check for missing slaves, and check their connection   Refer to https://www.solaredge.us/sites/default/files/troubleshooting_ undetected_RS485_devices.pdf Additional Troubleshooting  1.  Check that the modem or hub/router is functioning properly.  2.  Check that the connection to the internal connector on the communication board is properly done.  3.  Check that the selected communication option is properly configured.  4.  Use a method independent of the SolarEdge device to check whether the network and modem are  operating properly. For example, connect a laptop to the Ethernet router and connect to the  Internet.  5.  Check whether a firewall or another type of network filter is blocking communication. Error Codes The error messages include an error number (in firmware version 3.18xx and before) or a code (in  Firmware version 3.19xx and above) and a description: E r r o r C o d e X X X ( 3 x D 2 )
  • Page 65 Error Codes Code Error Troubleshooting v3.18xx CPU v3.19xx Message and above below No Country  Select the country as described in Country and Grid on page 41 Selected  Inv. Comm.  No communication with the digital board. Contact SolarEdge  Error  support. SW Error  Contact SolarEdge support. For info  3x6A  contact your   Inverter remotely locked. Contact your installer. installer Check: Internal RGM     The wiring of the meter CTs 3x6D Error    Connections to the inverter communication board. Refer to the meter troubleshooting in   Meter Comm.  3x6E Error ...
  • Page 66 Code Error Troubleshooting v3.18xx CPU v3.19xx Message and above below   If the inverter is located far from the  connection point to the grid, use a larger  gauge AC wire.    Consult the grid operator.   If permitted by local authorities,   c hange  the grid protection values. Refer to  http://www.solaredge.com/files/pdfs/vie wing_grid_protection_values.pdf AC voltage too low   Verify that the inverter is set to the correct country.    Consult the grid operator.  18x38 V-Line Min   If permitted by local authorities,   c hange the grid protection  values. Refer to  http://www.solaredge.com/files/pdfs/viewing_grid_ protection_values.pdf I-ACDC  57, 59, 60 18x39/3B/3C AC overcurrent. Contact SolarEdge support.
  • Page 67 Error Codes Code Error Troubleshooting v3.18xx CPU v3.19xx Message and above below output.    Refer to the AC Wiring Application Note http://www.solaredge.us/files/pdfs/application-note- recommended-wiring.pdf Temperature too high 18x75 Overtemp   Verify proper inverter clearances.    Make sure the heat-sink fins are clean and unobstructed.  Temperature too low 18x76 Undertemp Make sure the inverter is installed in a location with ambient  temperatures within the range specified in the datasheet. 18x7B MainError Grid measurements are out of range. Contact the grid operator.  RCD current surge. Ground faults may occur due to insufficient insulation to the  ground.  WARNING! ELECTRICAL SHOCK HAZARD. Do ...
  • Page 68 CPU v3.19xx Message and above below PV Isolation fault. The inverter has detected the PV solar array  is not properly isolated from ground earth. The isolation is  checked each time the inverter starts up.   Check the PV installation for isolation  problems and ground leakage.  18x86 Isolation   Only a certified PV installer must fix the  faulty string before connecting it to the  inverter.   Refer to  www.solaredge.us/files/pdfs/applicatio n_note_isolation_fault_troubleshooting.pdf 18x89 RCD Test Contact SolarEdge support.  Controller 3   18x9E Contact SolarEdge support. Tz Over  18xA3-5 Contact SolarEdge support. current 1/2/3   Verify that the inverter is set to the correct country.   Turn OFF the inverters in the site and verify AC grid  voltage.    If the inverter is located far from the ...
  • Page 69: Power Optimizer Troubleshooting

    Power Optimizer Troubleshooting Power Optimizer Troubleshooting If the inverter status screen indicates that not all power optimizers are paired or not all  are reporting (P_OK xxx/yyy, and x<y), those optimizers can be identified through the  LCD. Refer to https://www.solaredge.us/sites/default/files/non_reporting_power_ optimizers.pdf Possible cause and Problem troubleshooting Power optimizers are shaded.  If you connected the inverter to the   m onitoring  platform, retry pairing remotely (during  Pairing failed sunlight). Make sure to leave the inverter  ON/OFF switch ON and that S_OK appears in  the status screen. Power optimizer (s) output is disconnected. String voltage is 0V Connect all power optimizer outputs. Power optimizer(s) not connected in the string. Connect all power optimizers Module(s) not connected properly to power  optimizer inputs (not applicable to smart  modules). String voltage not 0V but lower than number of optimizers  Connect the modules to the optimizer inputs String reverse polarity. Check string polarity using a voltmeter and  correct if needed. Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 70   Measure the output voltage of each power  REDOUBLEZ DE PRECAUTION. Une deviation de optimizer to locate the power optimizer that  ±1% par string est raisonnable. does not output 1V safety voltage. If a  malfunctioning power optimizeris located,  check its connections, polarity, module,  and voltage.   Contact SolarEdge Support. Do not  continue before finding the problem and  replacing the malfunctioning power  optimizer. If a malfunction cannot be  bypassed or resolved, skip the  malfunctioning power optimizer, thus  connecting a shorter string.  Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 71: Appendix B: Mechanical Specifications

    Appendix B: Mechanical Specifications Appendix B: Mechanical Specifications The following figure provides inverter dimensions in mm [in]. Mounting Brackets Type 1 Figure 32: SE3000H-US - SE7600H-US Inverter dimensions Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 72 Appendix B: Mechanical Specifications Figure 33: SE10000H-US - SE11400H-US inverter dimensions Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 73: Mounting Bracket Type 2

    Mounting Bracket Type 2 Mounting Bracket Type 2 Figure 34: 10K - 11.4K inverter dimensions   Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1...
  • Page 74: Appendix C: Replacing And Adding System Components

    Appendix C: Replacing and Adding System Components Appendix C: Replacing and Adding System Components NOTE If you are permanently disassembling the installation or part of it, make sure to use the disposal  methods dictated by local regulations. Fuse Replacement The inverter is equipped with a fuse, located at the top right corner of the inverter. Fuse replacement kits are available from SolarEdge or you can use other fuses with identical ratings.  1.  Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe  (<50V), or wait five minutes before continuing to the next step. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five  minutes for the input capacitors of the inverter to discharge. AVERTISSEMENT! Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur l'écran LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient déchargés.
  • Page 75: Replacing An Inverter

    Replacing an Inverter Replacing an Inverter  1.  Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe  (<50V), or wait five minutes before continuing to the next step. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five  minutes for the input capacitors of the inverter to discharge. AVERTISSEMENT! Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur l'écran LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient déchargés.  2. ...
  • Page 76: Replacing The Dc Safety Unit

    Appendix C: Replacing and Adding System Components  9.  Remove the screws securing the inverter to the mounting brackets and lift the inverter from the  mounting bracket. Figure 37: Mounting brackets NOTE If you remove the old inverter and do not immediately install a new one, then:   Lock the DC Safety Unit in the OFF position using a lock on the switch.    Secure the DC Safety Unit bracket to the wall/pole, using 3 screws   Use insulation tape to isolate each of the AC and DC wires.    Seal the open conduits using duct tape.   Install the DC Safety Unit sealing cover supplied with the inverter   a nd secure with retaining clips.  10.  Place the new inverter on the mounting brackets and secure it using the screws.   11.  Insert the wires from the inverter into the openings in the DC Safety Unit.  12.  Fasten the two clips securing the DC Safety Unit to the inverter.   13.  Reconnect the cables: Follow the instructions of Installing the Inverter on page 23.  14.  Close the inverter cover.  15.  Perform the commissioning steps as described in Commissioning the Installation on page 32. Replacing the DC Safety Unit  1. ...
  • Page 77 Replacing the DC Safety Unit  3.  Turn OFF the DC Safety Unit.  4.  Open the DC Safety Unit cover: Release the four Allen screws and remove the cover.  5.  Open the inverter cover as described in Removing the Inverter Cover on page 54.  6.  Disconnect the DC and AC cables from the DC Safety Unit.  7.  Disconnect the wires connected between the inverter and the DC Safety Unit: Antenna cable from the communication board DC and AC wires in the DC Safety Unit Grounding cable  8.  Disconnect the DC Safety Unit from the inverter by opening the two clips securing the Safety Switch to the inverter: Carefully place a screwdriver between the clip and the enclosure and pull the clip. Figure 38: Disconnecting the DC Safety Unit from the inverter  9.  Detach the DC Safety Unit from the   i nverter.  10.  Place the new DC Safety Unit and secure it to the inverter using the clips.  11.  Insert the wires from the inverter into the openings in the DC Safety Unit.  12.  Reconnect the cables: Follow the instructions of Installing the Inverter on page 23.  13. ...
  • Page 78 Technical Specifications - Single Phase Inverters with HD-Wave Technology (North America) SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US Unit OUTPUT 3800 @ 240V 6000 @ 240V Rated AC Power Output 3000 5000 7600 10000 11400 3300 @ 208V 5000 @ 208V...
  • Page 79 Technical Specifications - Single Phase Inverters with HD-Wave Technology (North America) SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US Unit Power factor range 1 (adjustable from -0.85 to +0.85) Total harmonic distortion < 3% GFDI Threshold Utility Monitoring, Islanding Protection, Country Configurable...
  • Page 80 Technical Specifications - Single Phase Inverters with HD-Wave Technology (North America) SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US Unit Revenue Grade Data, ANSI Optional C12.20 Rapid Shutdown - NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect 2017 690.12...
  • Page 81 Technical Specifications - Single Phase Inverters with HD-Wave Technology (North America) Recommended OCPD size per grid: Inverter Maximum Output Current (A) Minimum Fuse Rating (A) Maximum Fuse Rating (A) 208 VAC 240 VAC SE3000H-US 12.5 SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US 47.5...

Table of Contents