Step 1: Activating the System
6. If required, perform the following additional steps before closing the inverter cover:
Country settings or inverter configuration using the internal LCD user buttons – refer to
l
Country and Grid on page 48.
Communication options connection – refer to Setting Up Communication to the Monitoring
l
Portal on page 59.
StorEdge application configuration - refer to System Configuration on page 67.
l
7. Close the inverter cover b y tightening the screws with a torque of 9.0 N*m/ 6.6 lb*ft. For proper
sealing, first tighten the corner screws and then the two central screws. The following figure
illustrates recommended order:
8. Make sure the AC Bypass switch in the StorEdge Connection Unit is switched to the left (position 1).
9. Make sure the backed-up loads AC breaker i n the StorEdge Connection Unit is UP.
10. Close the StorEdge Connection Unit cover: Attach the cover and secure it by tightening the six screws
with a torque of 1.2 N*m / 0.9 ft.*lb.
36
SolarEdge StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
Figure 25: Tightening order of the screws
Figure 26: StorEdge Connection Unit