SolarEdge StorEdge SE5000-xxS0 series Installation Manual page 69

For single battery or high capacity
Table of Contents

Advertisement

Configuring the RS485 Bus for Battery and Meter Connection
 4. Select Meter 2. The meter configuration screen is displayed (SolarEdge meters are pre-configured to
Device ID 2):
D e v i c e
P r o t o c o l
D e v i c e
C T
R a t i n g
M e t e r
 5. Configure the meter:
 a. Select Device Type è Revenue Meter
 b. Select Protocol è WattNode
 c. Verify that Device ID is set to  2.
 d. Set the CT value that appears on the CT label: CT Rating è <xxxxA>.
If CT resets to 0, check the communication as described in step b of verify the connection:below.
 e. For a meter installed at the grid connection point select Meter Func.è Export+Import.
E x p o r t + I m p o r t
E x p o r t
C o n s u m p t i o n
P r o d u c t i o n
I m p o r t
N o n e
The selected option is displayed in the RS485 Conf screen as <E+I>.
 6. Select Battery 1. The battery configuration screen is displayed:
D e v i c e
P r o t o c o l
D e v i c e
B a t t e r y
 7. Select Device Type è Battery Pack.
 8. To verify battery connection, select Battery Info and check that the   b attery information is displayed.
If not, check the wiring to the battery:
S N :
< s e r i a l
M o d e l :
R a t e d
F W
V e r .
Make sure to have the battery serial number and firmware version at hand whenever contacting 
support.
68
SolarEdge StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
T y p e
< M T R >
< W N >
I D
< 2 >
< 0 >
F u n c .
< N o n e >
T y p e
< B A T >
< T 7 4 >
I D
< 2 4 >
I n f o
<
>
# >
< X X X X X X >
P W R [ k W H ] :
N / A
< X X X X X >

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents