Configuring the RS485 Bus for Battery and Meter Connection
4. Select Meter 2. The meter configuration screen is displayed (SolarEdge meters are pre-configured to
Device ID 2):
D e v i c e
P r o t o c o l
D e v i c e
C T
R a t i n g
M e t e r
5. Configure the meter:
a. Select Device Type è Revenue Meter
b. Select Protocol è WattNode
c. Verify that Device ID is set to 2.
d. Set the CT value that appears on the CT label: CT Rating è <xxxxA>.
If CT resets to 0, check the communication as described in step b of verify the connection:below.
e. For a meter installed at the grid connection point select Meter Func.è Export+Import.
E x p o r t + I m p o r t
E x p o r t
C o n s u m p t i o n
P r o d u c t i o n
I m p o r t
N o n e
The selected option is displayed in the RS485 Conf screen as <E+I>.
6. Select Battery 1. The battery configuration screen is displayed:
D e v i c e
P r o t o c o l
D e v i c e
B a t t e r y
7. Select Device Type è Battery Pack.
8. To verify battery connection, select Battery Info and check that the b attery information is displayed.
If not, check the wiring to the battery:
S N :
< s e r i a l
M o d e l :
R a t e d
F W
V e r .
Make sure to have the battery serial number and firmware version at hand whenever contacting
support.
68
SolarEdge StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
T y p e
< M T R >
< W N >
I D
< 2 >
< 0 >
F u n c .
< N o n e >
T y p e
< B A T >
< T 7 4 >
I D
< 2 4 >
I n f o
<
>
# >
< X X X X X X >
P W R [ k W H ] :
N / A
< X X X X X >