Sun Oracle SPARC Enterprise M9000 Installation Manual page 57

Table of Contents

Advertisement

4. Lift up the cable holder, and remove the holder.
Removing the Cable Holders
FIGURE 3-25
5. Connect the power cord to the AC connector on the AC section.
The power cord is supplied with the server.
Note – If you are installing the M9000 server, the power cords should be connected in
order, from 1 to 5, as shown in
.
FIGURE 3-26
Chapter 3 Installing the Server
3-29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC Enterprise M9000 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sparc enterprise m8000

Table of Contents