Installation Workflow
This chapter describes the work required in the workflow from the server installation to
hardware operation verification. For details, see
Installation Workflow
TABLE 1-1
Installation Stage
Preliminary checks
↓
↓
↓
Installing and
connecting the servers
↓
↓
↓
Verifying settings and
powering on the server
↓
Workflow Task
Before installing the server, check the environmental requirements. See
"Checking Environmental Requirements" on page
Check the input power supply specifications for the server, and prepare an appropriate power
supply. See
Section 2.2.2, "Facility Power Requirements" on page
Check the service areas of the server. See
on page
2-12.
Prepare the required tools and instruments for the server installation. See
"Requirements for Server Installation" on page
Check components and accessories. See
If the server includes a SPARC Enterprise M9000 server expansion cabinet, or the power
cabinet, combine this component and the base cabinet. See
Expansion Cabinet and Power Cabinet" on page
Connect the input power supply cables, UPS cables, and console cable. See
"Connecting Cables" on page
Before connecting the power supply unit, verify the input voltage. See
the Input Power" on page
Access the XSCF Shell to verify the public key of the XSCF host, register a user account, and
perform the time setting and altitude setting. See
Required Information for the Servers" on page
Power on the system using the operator panel. Check the server configuration and verify the
operation in dual feed mode before powering off the system. See
On/Off the System" on page
TABLE 1-1
2-2.
Section 2.2.3, "Checking the Installation Location"
2-13.
Section 3.1, "Checking Components" on page
3-3.
3-24.
3-48.
Section 3.6, "Setting and Checking the
3-49.
3-53.
.
Section 2.2.1,
2-4.
Section 2.3,
Section 3.3, "Connecting the
Section 3.4,
Section 3.5, "Checking
Section 3.7, "Powering
3-1.
1-1