Note – Attach the removed front cover after the operation in
Section 3.4.3, "Cable
Connection Between the Base and Expansion Cabinets of the M9000 Server" on page 3-34
is
finished.
4. Remove the two (2) screws securing the right side cover of the base cabinet and
remove the cover.
Note – Be sure to remove the cover here because it cannot be removed after the units are
connected.
Removing the Right Side Cover of the Base Cabinet
FIGURE 3-4
Chapter 3 Installing the Server
3-7
Need help?
Do you have a question about the SPARC Enterprise M9000 and is the answer not in the manual?