Metering Motor Removal - Travis Industries Deerfield Service & Troubleshooting Manual

Table of Contents

Advertisement

Metering Motor Removal

Make sure the stove has fully cooled (approximately 25 minutes) before conducting service. Unplug the
stove to prevent electrical shock.
1.
Remove the rear panel (see section "Rear Panel Removal").
2.
Remove the Power Control Board and heat shield (see section "Power Control Board Removal").
3.
Remove the Exhaust Box (see section "Exhaust Box Removal").
4.
Disconnect the two wires on the motor from the wire harness at the quick connects.
5.
Depending on where the retaining screw ends up in the rotation of the HRD, you may need to remove the left convection
blower (see section "Convection Blower Removal").
6.
Use a 3/16" Allan wrench to loosen the retaining screw. If you only remove the screw enough to allow the shaft of the
motor to become free, the collar and spacer will stay in place making for easier re installation of the auger motor.
Spacer
Collar
Retaining
Screw
NOTE: When re-installing the auger motor make sure that the retaining screw is seated against the flat portion of the
"D" shaped portion of the auger shaft.
Auger
Shaft
"D" Shaped
part of Shaft
Auger
17602010 - 12/15/17
Page 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foxfire

Table of Contents