Miele H6260BP Operating And Installation Instructions page 110

Table of Contents

Advertisement

Cleaning and care
At the end of the activation phase the
steam injection system will need to be
cleaned to remove all traces of
descaling solution.
Cleaning is carried out by flushing
approx. 1 litre of fresh tap water
through the system. The water is
collected in the universal tray.
 Take the universal tray out of the oven
and empty it. Place the tray back in
the oven again on the top shelf level.
 Remove the plastic tube from the
container.
 Remove the container, rinse and fill it
with approx. 1 litre of fresh tap water.
 Place the container back in the oven,
insert the plastic tube, secure it to the
container and close the door.
 Confirm with OK.
110
The intake process for the first rinse
( ) starts.
Water will be flushed through the steam
injection system and will then collect in
the universal tray.
 Take the universal tray out of the oven
and empty it. Place the tray back in
the oven again on the top shelf level.
 Remove the plastic tube from the
container. Fill it with approx. 1 litre of
fresh tap water.
 Place the container back in the oven,
insert the plastic tube, secure it to the
container and close the door.
 Confirm with OK.
The intake process for the second
rinse ( ) will begin.
 Repeat the last four steps.
The intake process for the third rinse
( ) will begin.
Leave the universal tray (with the
water which has collected in it) on the
top oven shelf whilst the evaporation
process takes place.
 Remove the container and tube from
the oven.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents