To install and ground the IF cable down the mast, proceed as follows:
Procedure 5-12 Install and ground IF cable down the mast
Check that the main IF cable is connected to the mast top LPU and the
1
connection is weatherproofed.
2
Lay the main IF cable as far as the building entry point, ensuring there is
enough length to extend through the wall of the building to the LPU
inside.
3
Attach the main IF cable to the mast using the cable ties provided.
4
At the first point of contact between the IF cable and the mast, ground the
IF cable to the mast as described in
page 5-20.
5
At the mid point of the mast, ground the IF cable to the mast as described
in
6
At any additional required grounding points, ground the IF cable to the
mast as described in
At the point where the IF cable leaves the mast, ground it to the ground
7
bar as described in
Connecting ground cables to a mast or tower
Ground cables must be connected to the mast or tower using methods approved by
the tower manufacturer. Select the approved method, depending upon the shape of
the mast leg or beam:
x
Round mast leg
x
'H' section beam:
x
'L' section mast leg
5-66
Installing the cable grounding kit
Installing the cable grounding kit
Installing the cable grounding kit
(Figure
(Figure
(Figure
Installing the cable grounding kit
on page 5-20.
5-4)
5-5)
5-6)
Chapter 5 Installation
on
on page 5-20.
on page 5-20.
phn-1478_005v000
Apr 2010

Advertisement

Table of Contents
loading

Table of Contents