Section 6
Calibrating injection based sensitive rotor earth fault protection
6.7
66
After completion of the calibration step
Before leaving the ICT Tool

Auditing

During installations, calibrations and commissions the ICT generates reports for each
of the steps and collects them under the Auditing tab. See the procedures below on
how to view and delete reports as well as generate logs from reports.
1.
To view the reports, go to the Auditing tab.
GUID-8348F60B-9BF5-4018-9740-0FA3371B0F9F V1 EN
Figure 16:
Auditing tab
2.
Open and view each report.
3.
View reports in one of the following ways:
In the short cut menu, right click and select View report.
Click the View report button in the upper right corner of the auditing
screen.
Double click a report record.
4.
Delete reports in one of the following ways:
In the short cut menu, right click and select Delete report.
Click the Delete report button in the upper right corner of the auditing
screen.
Select a record with the mouse cursor then press the Delete key on the
keyboard.
5.
Generate logs in one of the following ways:
1MRK502053-UEN B
IEC11000049-1-en.vsd
Generator protection REG670 2.0 IEC
Commissioning manual