Preparing the Server for Component Replacement
Power supplies
■
Dual PCIe Card Carriers (DPCCs)
■
(CRU)" on page 148
See
"Prepare the Server for Hot Service (Oracle ILOM CLI)" on page 103
Server for Hot Service (Oracle ILOM Web Interface)" on page
Warm service
Warm service components can be serviced while the server is in Standby power mode. You can
remove and replace CMODs, DIMMs, and processors and heatsinks without disconnecting the
back panel AC power cords or shutting down Oracle ILOM.
The following components can be warm-serviced:
CMOD assembly
■
Processor (CPU)
■
DIMM memory
■
See
"Prepare the Server for Warm Service (Oracle ILOM CLI)" on page 105
Server for Warm Service (Oracle ILOM Web Interface)" on page
Cold service
Cold service components must be serviced when the server is completely powered off and all
four AC power cords are disconnected from the server back panel AC power block.
The following components can be cold-serviced:
System module (SMOD)
■
(FRU)" on page 195
Host bus adapter (HBA) card
■
Card" on page 200
HBA cable
■
Energy Storage Module (ESM)
■
Cables" on page 206
Energy Storage Module cable
■
Cables" on page 206
System Clock Battery
■
102
Oracle Server X7-8 Service Manual • October 2017
"Servicing Power Supplies (CRU)" on page 138
"Servicing PCIe Cards and Carriers
"Servicing CPU Module (CMOD) Components (FRU)" on page 160
"Servicing Processors" on page 170
"Servicing DIMMs" on page 182
"Servicing System Module (SMOD) Components
"Servicing the Host Bus Adapter (HBA)
"Servicing the SAS Cable" on page 211
"Servicing the Energy Storage Module and
"Servicing the Energy Storage Module and
"Replace the System Battery" on page 216
or
"Prepare the
104.
or
"Prepare the
107.