Table of Contents

Advertisement

4. Replacement and Adjustment
• Re-install the left end first (viewed from the front).

Roll Tray

Preparation
• The roll tray weighs 36 kg (80 lb.) At least two technicians are needed to remove it and re-install it.
• Prepare a clean flat surface to set the unit on after removal. The paper feed motor is mounted under
the roll tray. A strong table, or four blocks, to raise the roll tray slightly, is ideal and will make it easier
to service.
4
• Right rear cover, right front cover * p.259
• Rear cover * p.264
• Controller box cover * p.265
1. Remove:
[1] Open the harness clamps ( x 6)
[2] Connectors ( x 2)
326

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be-c1 d049

Table of Contents