Ricoh BE-C1 D046 Field Service Manual page 34

Table of Contents

Advertisement

2. Installation
Leveling the Machine
2
1. Place a level at [A] and [B].
2. Make the machine level by turning the bolts [C] on the machine's four feet.
• The gap [D] must be less than 2 mm for the bolt to clear the roll feeder (option) when the feeder
is opened and closed.
32

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be-c1 d049

Table of Contents