Reconnect Power and Data Cables

3.
If the cables are disconnected from the back of the server, that is, you
disconnected the cables because you extended the server out of the rack,
reconnect the cables.
For instructions to reconnect cables to the back of the server, see
Data Cables" on page
To identify the location of cable connectors on the back of the server, refer to
Connector Locations" on page
Related Information
"Reconnect Power and Data Cables" on page 216
Reconnect Power and Data Cables
1.
Reconnect the data cables to the back of the server, as appropriate.
If the cable management arm (CMA) is in the way, extend the server approximately 13 cm (5
inches) out of the front of the rack.
2.
Reconnect the power cables to the power supplies.
3.
If necessary, reinstall the cables into the cable management arm and secure
them with Velcro straps.

Power on the server.

4.
See
"Power On the Server" on page
Related Information
"Disconnect Cables From the Server" on page 59
"Reinstall the Server Into the Rack" on page 214
"Return the Server to the Normal Rack Position" on page 214
"Power On the Server" on page 216
Power On the Server
As soon as the power cords are connected, Standby power is applied. In Standby power mode,
the System OK LED on the server front panel blinks steadily. Depending on the configuration
of the firmware, the system might boot. If it does not boot, follow this procedure.
216