6.
Return the server to operation.
Install the top cover.
a.
See
"Install the Server Top Cover" on page
b.
Return the server to the normal rack position.
See
"Return the Server to the Normal Rack Position" on page
Connect any required data cables to the PCIe card.
c.
Route data cables through the cable management arm.
d.
Reconnect the power cords to the power supplies and power on the server.
See
"Reconnect Power and Data Cables" on page 216
Server" on page
7.
Use Oracle ILOM to clear any server PCIe card faults.
If a PCIe card fault message in Oracle ILOM is not cleared under Open Problems, you
must manually clear the fault using Oracle ILOM. For instructions for manually clearing
a PCIe card fault, see the procedure "Clear Faults for Undetected Replaced or Repaired
Hardware Components" in the Oracle ILOM User's Guide for System Monitoring and
Diagnostics Firmware Release 4.0.x in the Oracle Integrated Lights Out Manager (ILOM) 4.0
Documentation Library at http://www.oracle.com/goto/ilom/docs.
To determine whether additional steps are required to complete the installation
8.
of the PCIe card, refer to the server product notes for the type of PCIe card you
installed.
For a complete listing of the PCIe host bus adapter (HBA) cards supported by the server, refer
to the Oracle Server X7-2L Product Notes at http://www.oracle.com/goto/x7-2l/docs.
Related Information
"PCIe Slot Locations" on page 132
"Remove a PCIe Card" on page 133
216. Verify that the AC OK LED is lit.
212.
214.
and
"Power On the
Servicing PCIe Cards (CRU)
Install a PCIe Card
137

Advertisement

Table of Contents
loading

Table of Contents