Power on the server by performing one of the following actions:
Press the On/Standby button on the front bezel.
■
Log in to the Oracle ILOM web interface, click Host Management → Power Control and
■
select Power On from the Select Action list.
Log in to the Oracle ILOM command-line interface (CLI), and type the following command
■
at the Oracle ILOM prompt:
-> start /System
When the server is powered on and the power-on self-test (POST) code checkpoint tests
have completed, the green System OK LED status indicator on the front panel of the server
lights and remains lit.
Related Information
"Powering Down the Server" on page 53
■
"Reconnect Power and Data Cables" on page 216
■
Power On the Server
Returning the Server to Operation
217