Scheduling An Nqa Test Group - HP A3100-8 v2 EI Configuration Manual

A3100 v2 switch series
Hide thumbs Also See for A3100-8 v2 EI:
Table of Contents

Advertisement

To do...
Configure the maximum number of
hops a probe packet traverses in
the network
Configure the ToS field in an IP
packet header in an NQA probe
packet
Enable the routing table bypass
function

Scheduling an NQA test group

You can schedule an NQA test group by setting the start time and test duration for a test group.
A test group performs tests between the scheduled start time and the end time (the start time plus test
duration). If the scheduled start time is ahead of the system time, the test group starts testing immediately.
If both the scheduled start and end time are behind the system time, no test will start. To view the current
system time, use the display clock command.
Configuration prerequisites
Before you schedule an NQA test group, complete the following tasks:
Configure test parameters required for the test type.
Configure the NQA server for tests that require cooperation with the NQA server.
Scheduling an NQA test group
Follow these steps to schedule an NQA test group:
To do...
Enter system view
Schedule an NQA test group
Configure the maximum number of
tests that the NQA client can
simultaneously perform
NOTE:
After an NQA test group is scheduled, you cannot enter the test group view or test type view.
System adjustment does not affect started or completed test groups. It only affects test groups that have
not started.
Use the command...
ttl value
tos value
route-option bypass-route
Use the command...
system-view
nqa schedule admin-name
operation-tag start-time { hh:mm:ss
[ yyyy/mm/dd ] | now } lifetime
{ lifetime | forever }
nqa agent max-concurrent number
29
Remarks
Optional
20 by default.
Not available for DHCP tests.
Optional
0 by default.
Not available for DHCP tests.
Optional
Disabled by default.
Not available for DHCP tests.
Remarks
Required
now specifies the test group starts
testing immediately.
forever specifies that the tests do
not stop unless you use the undo
nqa schedule command.
Optional
By default, an NQA client can
simultaneously perform two tests at
most.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents