9 APPLICATION OF SETTINGS
c) THIRD HARMONIC NEUTRAL UNDERVOLTAGE
If the phase VTs are delta connected then third harmonic voltage cannot be measured and the 100% stator ground element
cannot be used. In this case the third harmonic neutral undervoltage element can be used. Field measurements should be
taken over the entire operating range of the machine to determine the variation of the third harmonic voltage as shown
below:
Figure 9–3: THIRD HARMONIC NEUTRAL UNDERVOLTAGE FIELD MEASUREMENTS
The element is accurate for levels as low as 0.25 volts, secondary. In this case, the pickup setting will be:
The third harmonic will dip below the pickup setting between 95 and 105 megawatts. The element should be blocked over
this range. A margin of 5% should be added to the relay settings. The values for maximum and minimum power will be:
Max Power
Voltage supervision will be given a setting of 0.8 pu in order to prevent maloperation during a sustained undervoltage con-
dition. A time delay of 5 seconds will be applied. If required, the element may be blocked when the machine is offline. Make
the following changes in EnerVista UR Setup or through the
STATOR GROUND
3RD HARM NTRL UNDERVOLTAGE
GE Multilin
0.25 V
---------------- -
PICKUP
=
240 V
105 10
×
-------------------------------------------------------- -
1.05
=
×
3
8000 157.5 66
85
×
-------------------------------------------------------- -
Min Power
0.95
=
3 8000
×
menu:
G60 Generator Protection System
Megawatts
0.001 pu
=
6
×
0.441 pu
=
×
×
6
×
10
0.323 pu
=
×
157.5 66
×

SETTINGS
GROUPED ELEMENTS
9.1 SETTING EXAMPLE
830733A1.CDR
(EQ 9.32)
(EQ 9.33)
(EQ 9.34)


SETTING GROUP 1