Site Preparation; Section See Page - GE AKTA avant Operating Instructions Manual

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4 Installation

4.1 Site preparation

4.1

Site preparation

Introduction
This section describes the site planning and the preparations necessary to perform before
installation of an ÄKTA avant system. The purpose is to provide planners and technical
staff with the data needed to prepare the laboratory for the installation.
The laboratory site must be planned and prepared before installing the ÄKTA avant
system. The performance specifications of the system can be met only if the laboratory
environment fulfills the requirements stated in this chapter.
In this section
Section
4.1.1 Delivery and storage
4.1.2 Room requirements
4.1.3 Site environment
4.1.4 Power requirements
4.1.5 Computer requirements
4.1.6 Required materials
52
ÄKTA avant Operating Instructions 29101556 AB
See page
53
55
58
60
61
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents