Installation; Site Requirements; Transport; Unpacking - GE ImageQuant LAS 4000 Original Instructions Manual

Hide thumbs Also See for ImageQuant LAS 4000:
Table of Contents

Advertisement

3 Installation

3 Installation
This chapter provides information regarding installation of the ImageQuant LAS 4000.

3.1 Site requirements

The following table gives a summary of power supply and environmental requirements. For detailed
information, refer to Section 7.1 Main specifications, on page 79.
Parameter
Power supply
Line frequency
Ambient temperature
Placement
Humidity

3.2 Transport

The ImageQuant LAS 4000 weighs approximately 57 kg and requires at least two people to lift and
move it.
Before moving the instrument:
1 Turn off the instrument.
2 Disconnect the power cord.
3 Remove the lens, transmitted light source and any loose parts from inside of the IDX. Refer to the
ImageQuant LAS 4000 User Manual.

3.3 Unpacking

When unpacking:
• Check the equipment for any apparent damage before installing.
26
Requirement
13 A, 100 - 120 V or 10 A, 200 - 240 V
50 to 60 Hz
15°C to 28°C, fluctuation < 10°C/h
(Storage: -25°C to 70°C)
Stable laboratory bench, load capacity > 100kg/m
At least 20 cm free on all sides
30% to 70%, non-condensing
(Storage: 5% to 100%, non-condensing)
Getting Started with ImageQuant LAS 4000 28-9607-59 AB
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ImageQuant LAS 4000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF