GE AKTA avant Operating Instructions Manual page 108

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

5 Prepare the system for a run
5.2 Prepare the flowpath
Part
8
9
10
11
12
13
14
15
16
17
18
19
20
Prepare the inlet tubing
Connect inlet tubing to the inlet ports that are to be used, and immerse all inlet tubing
that is to be used during the method run in the correct buffers.
108
Description
System pump A
Pressure monitor
Mixer
Injection valve
Sample loop or Superloop
Column valve
Column
UV monitor
Conductivity monitor
Flow restrictor
pH valve with pH monitor
Outlet valve
Fraction collector
ÄKTA avant Operating Instructions 29101556 AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents