GE AKTA avant Operating Instructions Manual page 97

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Step
9
10
End the run
Click the End button in the System Control toolbar to end the run.
ÄKTA avant Operating Instructions 29101556 AB
Action
Connect the syringe to the right purge valve on the sample pump, and repeat
step 6 to 8.
Check that there is no air left in the pump by following the instructions in
Validate prime or purge of System Pump A or B or Sample Pump, on page
4.5 Prime inlets and purge pump heads
4.5.2 Prime sample inlets and purge Sample Pump
4 Installation
92.
97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents