GE AKTA avant Operating Instructions Manual page 74

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4 Installation
4.2 Hardware installation
4.2.3 Prepare waste tubing
Prepare the waste tubing
Follow the instructions to prepare the waste tubing.
Step
1
2
3
74
Action
Place the four pieces of waste tubing from the injection valve, the pH valve
and the outlet valve (pieces of tubing marked W, W1, W2 and W3) in a vessel
placed below the bench.
NOTICE
The maximum level of the waste vessel for the waste
tubing from the valves must be lower than 30 cm
above the lab bench.
Place the three pieces of waste tubing from the fraction collector and the
buffer tray in a waste vessel placed below the bench.
NOTICE
The maximum level of the waste vessel for the waste
tubing from the fraction collector and the buffer tray
must be lower than the bench height.
Cut the waste tubing from the fraction collector and the buffer tray to appro-
priate length. It is important that the tubing is not bent and will not be sub-
merged in liquid during the run.
ÄKTA avant Operating Instructions 29101556 AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents