Installation; Site Requirements; Transport - GE AKTAprime plus Operating Instructions Manual

Table of Contents

Advertisement

3

Installation

ÄKTAprime plus is delivered in protective packing material and shall be unpacked with
great care.
Any equipment connected to ÄKTAprime plus must fulfill applicable standards and local
regulations.
A video describing the installation process, is supplied with each ÄKTAprime plus system.
For detailed information on Installation, see ÄKTAprime plus User Manual.
3.1

Site requirements

Parameter
Electrical power
Ambient temperature
Placement
Humidity
3.2

Transport

The equipment can be transported on a trolley capable of supporting at least 20 kg.
Before moving the system:
For more information on transport, see ÄKTAprime plus User Manual.
ÄKTAprime plus Operating Instructions 28-9597-89 AB
NOTICE
Lift the instrument in the upright position. Do not use the fraction-
ation arm as a lifting handle.
disconnect all cables and tubing connected to peripheral components and liquid
containers.
remove any loose items from the top of the instrument.
grasp the instrument firmly by placing the fingers under the base of the main unit
and lift.
Requirement
100-240 V, 50-60 Hz
4°C to 40°C
Stable laboratory bench e.g. 120 × 80 cm
20% to 95%, non-condensing
3 Installation
31

Advertisement

Table of Contents
loading

Table of Contents